GR 66 CORE : ISSUE 1
Current
The latest, up-to-date edition.
SPACE PLANNING DOCUMENTATION REQUIREMENTS
01-12-2013
Notice Of Disclaimer
List of Figures
Preface
1 Introduction
1.1 Purpose and Scope
1.2 Organization
2 Description
2.1 The Space Planning Process
2.2 Space Planning Aids
2.2.1 NEBS Data (ND) Sheets
2.2.2 Equipment Space Planning Algorithms (ESPAs)
2.2.3 Equipment Space Planning Guidelines
2.3 Issue Stages
2.4 Key Words Defined
3 Requirements
3.1 Frame Identification
3.2 Basic Frame Data
3.2.1 Height
3.2.2 Depth
3.2.3 Effective Frame Width
3.2.4 Weight
3.2.5 Minimum Front/Rear Aisles
3.2.6 Frames per Function
3.2.7 Units per Frame
3.3 Heat Release Data
3.3.1 Power-Consuming Frames
3.3.2 Power-Distributing/Conditioning Frames
3.4 Current Drains
3.4.1 DC Current Drains
3.4.2 AC Current Drains
3.5 Cabling Data
3.6 NEBS Compatibility
3.7 Other Data
3.8 Miscellaneous Equipment
3.9 Vendor Review of Proposed NEBS Data (ND) Sheets
Appendix A: References
Note
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.