• There are no items in your cart

I.S. EN 61400-12-2:2013

Current

Current

The latest, up-to-date edition.

WIND TURBINES - PART 12-2: POWER PERFORMANCE OF ELECTRICITYPRODUCING WIND TURBINES BASED ON NACELLE ANEMOMETRY

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2013

Preview

For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.

Only cited Standards give presumption of conformance to New Approach Directives/Regulations.

National Foreword
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols and units
5 Overview of test method
6 Preparation for performance test
7 Test equipment
8 Measurement procedure
9 Derived results
10 Reporting format
Annex A (informative) - Nacelle instrument mounting
Annex B (normative) - Measurement sector procedure
Annex C (normative) - Nacelle wind speed transfer function
        validity procedure
Annex D (normative) - Nacelle wind speed transfer function
        measurement procedure
Annex E (normative) - Evaluation of uncertainty in measurement
Annex F (normative) - Theoretical basis for determining the
        uncertainty of measurement using the method of bins
Annex G (normative) - NTF/NPC uncertainty estimates and
        Calculation
Annex H (normative) - Allowable anemometry instrument types
Annex I (informative) - Results and uncertainty considerations
Annex J (informative) - Example multi-turbine NTF/NPC
        uncertainty calculation
Annex K (informative) - Organisation of test, safety and
        communication
Annex L (informative) - NPC and NTF flowchart
Annex ZA (normative) - Normative references to
         international publications with their
         corresponding European publications

Describes a procedure for verifying the power Performance characteristics of a single electricity- producing, horizontal axis wind turbine, which is not considered to be a small wind turbine per IEC 61400-2.

DevelopmentNote
For CENELEC adoptions of IEC publications, please check www.iec.ch to be sure that you have any corrigenda that may apply. (01/2017) For CENELEC adoptions of IEC publications, please check www.iec.ch to be sure that you have any corrigenda that may apply. (01/2017)
DocumentType
Standard
Pages
107
PublisherName
National Standards Authority of Ireland
Status
Current
SupersededBy

Standards Relationship
EN 61400-12-2:2013/AC:2016-10 Identical

EN 60688:2013 Electrical measuring transducers for converting A.C. and D.C. electrical quantities to analogue or digital signals
ISO/IEC 17025:2005 General requirements for the competence of testing and calibration laboratories
IEC 61869-3:2011 Instrument transformers - Part 3: Additional requirements for inductive voltage transformers
IEC 61400-12-1:2017 Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines
IEC 61869-2:2012 Instrument transformers - Part 2: Additional requirements for current transformers
IEC 60688:2012 Electrical measuring transducers for converting A.C. and D.C. electrical quantities to analogue or digital signals
EN 61869-3 : 2011 INSTRUMENT TRANSFORMERS - PART 3: ADDITIONAL REQUIREMENTS FOR INDUCTIVE VOLTAGE TRANSFORMERS (IEC 61869-3:2011)
EN 61869-2 : 2012 INSTRUMENT TRANSFORMERS - PART 2: ADDITIONAL REQUIREMENTS FOR CURRENT TRANSFORMERS
ISO 2533:1975 Standard Atmosphere
EN 61400-12-1:2017 Wind energy generation systems - Part 12-1: Power performance measurement of electricity producing wind turbines
ISO/IEC Guide 98-3:2008 Uncertainty of measurement — Part 3: Guide to the expression of uncertainty in measurement (GUM:1995)

View more information
US$141.42
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.