• There are no items in your cart

I.S. EN 61850-4:2011&A1:2020

Current

Current

The latest, up-to-date edition.

Communication networks and systems for power utility automation - Part 4: System and project management

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-04-2021

Preview

For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.

Only cited Standards give presumption of conformance to New Approach Directives/Regulations.

FOREWORD
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Engineering requirements
6 System life cycle
7 Quality assurance
Annex A (informative) Announcement of discontinuation (example)
Annex B (informative) Delivery obligations after discontinuation (example)
Bibliography

This part of IEC 61850 applies to projects associated with processes near automation systems of power utilities (UAS, utility automation system), such as substation automation systems (SAS).

Committee
IEC/TC 57
DocumentType
Standard
ISBN
978-2-8322-8925-9
Pages
132
ProductNote
The date of any NSAI previous adoption may not match the date of its original CEN/CENELEC document.
PublisherName
National Standards Authority of Ireland
Status
Current
Supersedes

Standards Relationship
EN 61850-4:2011/A1:2020 Identical
IEC 61850-4:2011/AMD1:2020 Identical

View more information
US$87.89
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.