• There are no items in your cart

IEC 61064:1991

Withdrawn
Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Acceptance tests for steam turbine speed control systems
Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Withdrawn date

12-31-2021

Language(s)

English - French

Published date

05-22-1991

Foreword
1 Scope and object
2 Normative reference
3 Terms, symbols, definitions and units
4 Guiding principles
   4.1 Matters on which agreement shall be reached
   4.2 Time of carrying out tests
   4.3 Preparation for acceptance tests
   4.4 Instruments
   4.5 Test report
5 Speed governing system tests
   5.1 Turbine at standstill
   5.2 Turbine at no-load
        5.2.1 Overview
        5.2.2 Test procedure for determination of static
               characteristics
        5.2.3 Determination of dead band
        5.2.4 Speed range determination
        5.2.5 Stability
   5.3 Turbine on load
        5.3.1 Overview
        5.3.2 Test conditions
        5.3.3 Load-steam flow demand relationship
        5.3.4 Dead band determination - Overview
        5.3.5 Dead band determination - Method 1
        5.3.6 Dead band determination - Method 2
        5.3.7 Determination of steady-state speed regulation -
               Method 1
        5.3.8 Determination of steady-state speed regulation -
               Method 2
        5.3.9 Determination of incremental speed regulation -
               Method 1
        5.3.10 Determination of incremental speed regulation -
               Method 2
        5.3.11 Stability
   5.4 Dynamic tests of the speed governing system by
        sudden load rejection to no-load
        5.4.1 Overview
        5.4.2 Operating conditions
        5.4.3 Test procedure
        5.4.4 Test results
        5.4.5 Stability
6 Overspeed protection system tests
   6.1 Turbine at standstill
   6.2 Turbine at no-load
   6.3 Turbine on load
   6.4 Dynamic testing of overspeed protection system
        by turbine trip from maximum load
        6.4.1 Overview
        6.4.2 Operating conditions
        6.4.3 Test procedure
        6.4.4 Test results
Annex A General guidance
Figures

Contains recommendations for the conduct of tests of speed control systems of steam turbines. Applies primarily to constant speed steam turbines but may be applied where appropriate for other types of turbines. The purpose of the tests described in this publication is to verify the criteria guaranteed by the manufacturer and to check compliance with IEC 60045-1.

DevelopmentNote
Also numbered as BS EN 61064. (12/2005) Stability date: 2019. (09/2017)
DocumentType
Standard
Pages
59
PublisherName
International Electrotechnical Committee
Status
Withdrawn

Standards Relationship
NF EN 61064 : 1993 Identical
NEN 11064 : 1994 Identical
I.S. EN 61064:1993 Identical
PN EN 61064 : 1998 Identical
SN EN 61064 : 1993 Identical
CEI EN 61064 : 1996 Identical
EN 61064:1993 Corresponds
UNE-EN 61064:1992 Identical

CEI EN 60045-1 : 1996 STEAM TURBINES - PART 1: SPECIFICATIONS
ISO 14661:2000 Thermal turbines for industrial applications (steam turbines, gas expansion turbines) General requirements
BS EN 60045-1:1993 Guide to steam turbine procurement Guide to steam turbine procurement
BS ISO 14661:2000 Thermal turbines for industrial applications (steam turbines, gas expansion turbines). General requirements
EN 60045-1:1993 Steam turbines - Part 1: Specifications

IEC 60045:1970 Specification for steam turbines

View more information
US$220.00
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.