• There are no items in your cart

IEC 61850-7-1:2011

Superseded
Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Superseded date

09-08-2020

Language(s)

English - French

Published date

07-15-2011

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Overview of the IEC 61850 series concepts
6 Modelling approach of the IEC 61850 series
7 Application view
8 Device view
9 Communication view
10 Where physical devices, application models
   and communication meet
11 Relationships between IEC 61850-7-2,
   IEC 61850-7-3 and IEC 61850-7-4
12 Formal specification method
13 Name spaces
14 Common rules for new version of classes and for
   extension of classes
Annex A (informative) - Overview of logical nodes and data
Annex B (informative) - Allocation of data to logical nodes
Annex C (informative) - Use of the substation configuration
        language (SCL)
Annex D (informative) - Applying the LN concept to options
        for future extensions
Annex E (informative) - Relation between logical nodes and
        PICOMs
Annex F (informative) - Mapping the ACSI to real communication
        systems
Bibliography

IEC 61850-7-1:2011 introduces the modelling methods, communication principles, and information models that are used in the various parts of the IEC 61850-7 series. The purpose is to provide - from a conceptual point of view - assistance to understand the basic modelling concepts and description methods for:
- substation-specific information models for power utility automation systems,
- device functions used for power utility automation purposes, and
- communication systems to provide interoperability within power utility facilities. Compared to the first edition, this second edition introduces:
- the model for statistical and historical statistical data,
- the concepts of proxies, gateways, LD hierarchy and LN inputs,
- the model for time synchronisation,
- the concepts behind different testing facilities,
- the extended logging function. It also clarifies certain items.

Committee
TC 57
DevelopmentNote
Stability Date: 2017. (09/2017) NEW CHILD AMD 1 IS NOW ADDED
DocumentType
Standard
Pages
498
ProductNote
NEW CHILD AMD 1 IS NOW ADDED
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy
Supersedes

CEI EN 61400-25-1 : 2007 WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
IEC 61400-25-1:2017 Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
12/30274900 DC : 0 BS IEC 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS
07/30168422 DC : 0 BS EN 61850-8-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
CEI EN 61850-7-420 : 2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES
BS EN 61400-25-1:2017 Wind energy generation systems Communications for monitoring and control of wind power plants. Overall description of principles and models
16/30344488 DC : 0 BS EN 61850-7-2+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
PD IEC/TR 61850-7-500:2017 Communication networks and systems for power utility automation Basic information and communication structure. Use of logical nodes for modeling application functions and related concepts and guidelines for substations
CEI EN 61400-25-6 : 2011 WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
I.S. EN 61850-7-2:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
EN 61400-25-5:2017 Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
CEI EN 61850-9-2 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3
BS EN 61850-8-1:2011 Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
BS EN 61850-6:2010 Communication networks and systems for power utility automation Configuration description language for communication in electrical substations related to IEDs
CEI EN 61850-7-2 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
OVE/ONORM EN 61400-25-5 : 2007 WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING
I.S. EN 61400-25-6:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
I.S. EN 62271-3:2015 HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850
CEI EN 61850-8-1 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
I.S. EN 61850-9-2:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 (IEC 61850-9-2:2011 (EQV))
IEC 61850-6:2009 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
IEC TS 62351-2:2008 Power systems management and associated information exchange - Data and communications security - Part 2: Glossary of terms
IEC TR 61850-1:2013 Communication networks and systems for power utility automation - Part 1: Introduction and overview
NF EN 61850-6 : 2004 COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS
IEC 61400-25-4:2016 RLV Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
EN 61400-25-1:2017 Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
EN 61400-25-4:2017 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
EN 61850-10:2013 Communication networks and systems for power utility automation - Part 10: Conformance testing
EN 62271-3:2015 High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850
EN 61400-25-6:2017 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
EN 61850-7-420:2009 Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes
EN 61850-6:2010 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
03/110578 DC : DRAFT AUG 2003 IEC 61400-25 ED.1.0 - WIND TURBINES - PART 25: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS
IEEE 1547.3 : 2007 MONITORING, INFORMATION EXCHANGE, AND CONTROL OF DISTRIBUTED RESOURCES INTERCONNECTED WITH ELECTRIC POWER SYSTEMS
09/30145360 DC : 0 BS EN 61850-9-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM)- SAMPLED VALUES OVER ISO/IEC 8802-3
05/30137801 DC : DRAFT AUG 2005 IEC 61400-25-2 ED 1 - WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS
02/206919 DC : DRAFT MAY 2002 IEC 61850-8-1. ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO MMS (ISO/IEC 9506 PART 1 AND PART 2) OVER ISO 8802-3
I.S. EN 61400-25-2:2015 WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS
CEI EN 61850-5 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS
CEI EN 61850-10 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING
16/30346107 DC : 0 BS EN 61400-25-1 ED.2 - WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
17/30358470 DC : 0 BS EN 61850-8-2 ED1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP)
07/30147754 DC : 0 BS IEC 61850-6 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS
BS EN 61400-25-2:2015 Wind turbines Communications for monitoring and control of wind power plants - Information models
09/30212527 DC : 0 BS EN 61850-7-410 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
BS EN 61850-9-2:2011 Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Sampled values over ISO/IEC 8802-3
12/30260040 DC : 0 BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION
PD IEC/TR 61850-90-17:2017 Communication networks and systems for power utility automation Using IEC 61850 to transmit power quality data
IEC TS 61850-2:2003 Communication networks and systems in substations - Part 2: Glossary
IEC TR 61850-90-5:2012 Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
IEEE C37.119-2005 IEEE Guide for Breaker Failure Protection of Power Circuit Breakers
I.S. EN 61850-7-3:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-3: BASIC COMMUNICATION STRUCTURE - COMMON DATA CLASSES
I.S. EN 61850-7-420:2009 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES
IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
IEC 61869-9:2016 Instrument transformers - Part 9: Digital interface for instrument transformers
BS EN 61850-7-4:2010 Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes
DD IEC/TS 62351-7:2010 Power systems management and associated information exchange. Data and communication security Network and system management (NSM) data object models
PD IEC/TR 61850-1:2013 Communication networks and systems for power utility automation Introduction and overview
12/30267268 DC : 0 BS EN 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS
PD IEC/TR 61850-90-4:2013 Communication networks and systems for power utility automation Network engineering guidelines
02/206918 DC : DRAFT MAY 2002 IEC 61850-6. ED.1 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: SUBSTATION AUTOMATION SYSTEM CONFIGURATION DESCRIPTION LANGUAGE
DD IEC/TS 61850-2:2003 Communication networks and systems in substations Glossary
12/30265386 DC : 0 BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850
11/30251804 DC : 0 BS EN 61850-10 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING
BS EN 61850-7-3:2011 Communication networks and systems for power utility automation Basic communication structure. Common data classes
16/30336107 DC : 0 BS EN 61850-7-4 AMD1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES
15/30326344 DC : 0 BS EN 61850-8-2 ED 1.0 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP)
BS EN 61850-7-410 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
BS EN 61850-5:2013 Communication networks and systems for power utility automation Communication requirements for functions and device models
BS EN 61400-25-5:2017 Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing
CEI EN 61400-25-5 : 2007 WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING
I.S. EN 61850-6:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS
I.S. EN 61850-7-4:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES
IEC 61400-25-1 REDLINE : 2ED 2017 WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
CEI EN 61850-7-4 : 2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES
IEC 62270:2013 Guide for computer-based control for hydroelectric power plant automation
NF EN 61850-8-1 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
NF EN 61850-7-2 : 2003 COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-2: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
EN 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
EN 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
NF EN 61400-25-1 : 2017 WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
BS EN 62271-3:2015 High-voltage switchgear and controlgear Digital interfaces based on IEC 61850
17/30358185 DC : 0 BS EN 61850-8-1+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
OVE/ONORM EN 61400-25-1 : 2007 WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
PD IEC/TR 61850-90-2:2016 Communication networks and systems for power utility automation Using IEC 61850 for communication between substations and control centres
05/30137797 DC : DRAFT AUG 2005 IEC 61400-25-1 ED 1 - WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
07/30145348 DC : 0 BS EN 61850-7-3 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-3: BASIC COMMUNICATION STRUCTURE - COMMON DATA CLASSES
14/30301438 DC : 0 BS EN 62746-3 ED 1.0 - SYSTEMS INTERFACE BETWEEN CUSTOMER ENERGY MANAGEMENT SYSTEM AND THE POWER MANAGEMENT SYSTEM - PART 3: ARCHITECTURE
07/30166755 DC : 0 BS EN 61850-7-4 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES
PD IEC/TR 61850-90-5:2012 Communication networks and systems for power utility automation Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
BS EN 61400-25-6:2017 Wind energy generation systems Communications for monitoring and control of wind power plants. Logical node classes and data classes for condition monitoring
BS EN 61850-7-2:2010 Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI)
I.S. EN 61400-25-4:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
BS EN 61850-10:2013 Communication networks and systems for power utility automation Conformance testing
DD IEC/TS 62351-2:2008 Power systems management and associated information exchange. Data and communications security Glossary of terms
IEC TR 61850-7-500:2017 Communication networks and systems for power utility automation - Part 7-500: Basic information and communication structure - Use of logical nodes for modeling application functions and related concepts and guidelines for substations
IEC TR 61850-90-10:2017 Communication networks and systems for power utility automation - Part 90-10: Models for scheduling
I.S. EN 61400-25-5:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING
IEC TS 62351-7:2010 Power systems management and associated information exchange - Data and communications security - Part 7: Network and system management (NSM) data object models
NF EN 61850-7-4 : 2003 COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-4: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES
IEC TR 61850-90-17:2017 Communication networks and systems for power utility automation - Part 90-17: Using IEC 61850 to transmit power quality data
I.S. EN 61850-8-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
I.S. EN 61850-9-2:2011&A1:2020 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 (IEC 61850-9-2:2011/A1:2020)<br>
IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
EN 61850-7-3:2011 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
IEC 62271-3:2015 High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850
IEC 61850-7-410:2012+AMD1:2015 CSV Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
EN 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 61850-7-420:2009 Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes
EN 61850-7-2:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
07/30166751 DC : 0 BS EN 61850-7-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
16/30347565 DC : 0 BS EN 61400-25-5 - WIND ENERGY GENERATION SYSTEMS COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING
I.S. EN 61850-7-410:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
03/304152 DC : DRAFT MAR 2003 IEC 61850-10 ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 10: CONFORMANCE TESTING
05/30137813 DC : DRAFT AUG 2005 IEC 61400-25-5 ED 1 - WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING
PD IEC/TR 61850-90-10:2017 Communication networks and systems for power utility automation Models for scheduling
BS EN 61850-7-420:2009 Communication networks and systems for power utility automation Basic communication structure. Distributed energy resources logical nodes
IEC 61400-25-4 REDLINE : 2ED 2016 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
CEI EN 61850-6 : 2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS
NF EN 61400-25-2 : 2016 WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS
IEEE/IEC 1249-2013 IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation
I.S. EN 61400-25-1:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
CEI EN 61850-7-3 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-3: BASIC COMMUNICATION STRUCTURE - COMMON DATA CLASSES
IEEE 2030.100-2017 IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System
IEC TR 61850-90-2:2016 Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres
IEC 61400-25-5:2017 Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
I.S. EN 61850-5:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS (IEC 61850-5:2013 (EQV))
I.S. EN 61850-10:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV))
EN 61850-7-410:2013/A1:2016 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL (IEC 61850-7-410:2012/A1:2015)
IEC 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 61850-10:2012 Communication networks and systems for power utility automation - Part 10: Conformance testing
IEC 61400-25-6:2016 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
IEC 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
IEC 61400-25-1:2017 RLV Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
EN 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
EN 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models

IEC 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
ISO 9506-2:2003 Industrial automation systems Manufacturing Message Specification Part 2: Protocol specification
IEC 61850-6:2009 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
ISO/IEC 8802-3:2000 Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 3: Carrier sense multiple access with collision detection (CSMA/CD) access method and physical layer specifications
ISO 9506-1:2003 Industrial automation systems Manufacturing Message Specification Part 1: Service definition
IEC TR 61850-90-1:2010 Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations
IEC 61346-1:1996 Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 1: Basic rules
IEC 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 60050-101:1998 International Electrotechnical Vocabulary (IEV) - Part 101: Mathematics
IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
IEC 61850-4:2011 Communication networks and systems for power utility automation - Part 4: System and project management
IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
IEC 61850-10:2012 Communication networks and systems for power utility automation - Part 10: Conformance testing
IEC TS 61850-2:2003 Communication networks and systems in substations - Part 2: Glossary
IEC 61346-2:2000 Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 2: Classification of objects and codes for classes
IEC 61850-3:2013 Communication networks and systems for power utility automation - Part 3: General requirements

View more information
US$464.00
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.