IEC 61850-7-1:2011
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
09-08-2020
English - French
07-15-2011
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Overview of the IEC 61850 series concepts
6 Modelling approach of the IEC 61850 series
7 Application view
8 Device view
9 Communication view
10 Where physical devices, application models
and communication meet
11 Relationships between IEC 61850-7-2,
IEC 61850-7-3 and IEC 61850-7-4
12 Formal specification method
13 Name spaces
14 Common rules for new version of classes and for
extension of classes
Annex A (informative) - Overview of logical nodes and data
Annex B (informative) - Allocation of data to logical nodes
Annex C (informative) - Use of the substation configuration
language (SCL)
Annex D (informative) - Applying the LN concept to options
for future extensions
Annex E (informative) - Relation between logical nodes and
PICOMs
Annex F (informative) - Mapping the ACSI to real communication
systems
Bibliography
IEC 61850-7-1:2011 introduces the modelling methods, communication principles, and information models that are used in the various parts of the IEC 61850-7 series. The purpose is to provide - from a conceptual point of view - assistance to understand the basic modelling concepts and description methods for:
- substation-specific information models for power utility automation systems,
- device functions used for power utility automation purposes, and
- communication systems to provide interoperability within power utility facilities. Compared to the first edition, this second edition introduces:
- the model for statistical and historical statistical data,
- the concepts of proxies, gateways, LD hierarchy and LN inputs,
- the model for time synchronisation,
- the concepts behind different testing facilities,
- the extended logging function. It also clarifies certain items.
Committee |
TC 57
|
DevelopmentNote |
Stability Date: 2017. (09/2017) NEW CHILD AMD 1 IS NOW ADDED
|
DocumentType |
Standard
|
Pages |
498
|
ProductNote |
NEW CHILD AMD 1 IS NOW ADDED
|
PublisherName |
International Electrotechnical Committee
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
OVE EN 61850-7-1:2023 01 01 | Identical |
OVE/ONORM EN 61850-7-1 : 2012 | Identical |
NBN EN 61850 7-1 : 2012 | Identical |
NEN EN IEC 61850-7-1 : 2011 | Identical |
PN EN 61850-7-1 : 2011 | Identical |
SANS 61850-7-1 : 1ED 2012 | Identical |
CEI EN 61850-7-1 : 2012 | Identical |
EN 61850-7-1:2011 | Identical |
NF EN 61850-7-1 : 2012 | Identical |
DIN EN 61850-7-1:2012-04 | Identical |
SANS 61850-7-1:2012(R2018) | Identical |
BS EN 61850-7-1:2011 | Identical |
GOST R IEC 61850-7-1 : 2009 | Identical |
UNE-EN 61850-7-1:2011 | Identical |
BS EN 61557-1:2007 | Identical |
I.S. EN 61850-7-1:2011 | Identical |
CEI EN 61400-25-1 : 2007 | WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
IEC 61400-25-1:2017 | Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models |
12/30274900 DC : 0 | BS IEC 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS |
07/30168422 DC : 0 | BS EN 61850-8-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
CEI EN 61850-7-420 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES |
BS EN 61400-25-1:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Overall description of principles and models |
16/30344488 DC : 0 | BS EN 61850-7-2+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
PD IEC/TR 61850-7-500:2017 | Communication networks and systems for power utility automation Basic information and communication structure. Use of logical nodes for modeling application functions and related concepts and guidelines for substations |
CEI EN 61400-25-6 : 2011 | WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
I.S. EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
EN 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
CEI EN 61850-9-2 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 |
BS EN 61850-8-1:2011 | Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
BS EN 61850-6:2010 | Communication networks and systems for power utility automation Configuration description language for communication in electrical substations related to IEDs |
CEI EN 61850-7-2 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
OVE/ONORM EN 61400-25-5 : 2007 | WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
I.S. EN 61400-25-6:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
I.S. EN 62271-3:2015 | HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
CEI EN 61850-8-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
I.S. EN 61850-9-2:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 (IEC 61850-9-2:2011 (EQV)) |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC TS 62351-2:2008 | Power systems management and associated information exchange - Data and communications security - Part 2: Glossary of terms |
IEC TR 61850-1:2013 | Communication networks and systems for power utility automation - Part 1: Introduction and overview |
NF EN 61850-6 : 2004 | COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
IEC 61400-25-4:2016 RLV | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 61400-25-1:2017 | Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models |
EN 61400-25-4:2017 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 61850-10:2013 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 62271-3:2015 | High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
EN 61400-25-6:2017 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
EN 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
EN 61850-6:2010 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
03/110578 DC : DRAFT AUG 2003 | IEC 61400-25 ED.1.0 - WIND TURBINES - PART 25: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS |
IEEE 1547.3 : 2007 | MONITORING, INFORMATION EXCHANGE, AND CONTROL OF DISTRIBUTED RESOURCES INTERCONNECTED WITH ELECTRIC POWER SYSTEMS |
09/30145360 DC : 0 | BS EN 61850-9-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM)- SAMPLED VALUES OVER ISO/IEC 8802-3 |
05/30137801 DC : DRAFT AUG 2005 | IEC 61400-25-2 ED 1 - WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
02/206919 DC : DRAFT MAY 2002 | IEC 61850-8-1. ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO MMS (ISO/IEC 9506 PART 1 AND PART 2) OVER ISO 8802-3 |
I.S. EN 61400-25-2:2015 | WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
CEI EN 61850-5 : 2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS |
CEI EN 61850-10 : 2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
16/30346107 DC : 0 | BS EN 61400-25-1 ED.2 - WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
17/30358470 DC : 0 | BS EN 61850-8-2 ED1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP) |
07/30147754 DC : 0 | BS IEC 61850-6 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
BS EN 61400-25-2:2015 | Wind turbines Communications for monitoring and control of wind power plants - Information models |
09/30212527 DC : 0 | BS EN 61850-7-410 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
BS EN 61850-9-2:2011 | Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Sampled values over ISO/IEC 8802-3 |
12/30260040 DC : 0 | BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
PD IEC/TR 61850-90-17:2017 | Communication networks and systems for power utility automation Using IEC 61850 to transmit power quality data |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
IEC TR 61850-90-5:2012 | Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
IEEE C37.119-2005 | IEEE Guide for Breaker Failure Protection of Power Circuit Breakers |
I.S. EN 61850-7-3:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-3: BASIC COMMUNICATION STRUCTURE - COMMON DATA CLASSES |
I.S. EN 61850-7-420:2009 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 61869-9:2016 | Instrument transformers - Part 9: Digital interface for instrument transformers |
BS EN 61850-7-4:2010 | Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes |
DD IEC/TS 62351-7:2010 | Power systems management and associated information exchange. Data and communication security Network and system management (NSM) data object models |
PD IEC/TR 61850-1:2013 | Communication networks and systems for power utility automation Introduction and overview |
12/30267268 DC : 0 | BS EN 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS |
PD IEC/TR 61850-90-4:2013 | Communication networks and systems for power utility automation Network engineering guidelines |
02/206918 DC : DRAFT MAY 2002 | IEC 61850-6. ED.1 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: SUBSTATION AUTOMATION SYSTEM CONFIGURATION DESCRIPTION LANGUAGE |
DD IEC/TS 61850-2:2003 | Communication networks and systems in substations Glossary |
12/30265386 DC : 0 | BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
11/30251804 DC : 0 | BS EN 61850-10 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
BS EN 61850-7-3:2011 | Communication networks and systems for power utility automation Basic communication structure. Common data classes |
16/30336107 DC : 0 | BS EN 61850-7-4 AMD1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
15/30326344 DC : 0 | BS EN 61850-8-2 ED 1.0 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP) |
BS EN 61850-7-410 : 2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
BS EN 61850-5:2013 | Communication networks and systems for power utility automation Communication requirements for functions and device models |
BS EN 61400-25-5:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing |
CEI EN 61400-25-5 : 2007 | WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
I.S. EN 61850-6:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
I.S. EN 61850-7-4:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
IEC 61400-25-1 REDLINE : 2ED 2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
CEI EN 61850-7-4 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
IEC 62270:2013 | Guide for computer-based control for hydroelectric power plant automation |
NF EN 61850-8-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
NF EN 61850-7-2 : 2003 | COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-2: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
EN 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
EN 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
NF EN 61400-25-1 : 2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
BS EN 62271-3:2015 | High-voltage switchgear and controlgear Digital interfaces based on IEC 61850 |
17/30358185 DC : 0 | BS EN 61850-8-1+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
OVE/ONORM EN 61400-25-1 : 2007 | WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
PD IEC/TR 61850-90-2:2016 | Communication networks and systems for power utility automation Using IEC 61850 for communication between substations and control centres |
05/30137797 DC : DRAFT AUG 2005 | IEC 61400-25-1 ED 1 - WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
07/30145348 DC : 0 | BS EN 61850-7-3 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-3: BASIC COMMUNICATION STRUCTURE - COMMON DATA CLASSES |
14/30301438 DC : 0 | BS EN 62746-3 ED 1.0 - SYSTEMS INTERFACE BETWEEN CUSTOMER ENERGY MANAGEMENT SYSTEM AND THE POWER MANAGEMENT SYSTEM - PART 3: ARCHITECTURE |
07/30166755 DC : 0 | BS EN 61850-7-4 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES |
PD IEC/TR 61850-90-5:2012 | Communication networks and systems for power utility automation Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
BS EN 61400-25-6:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Logical node classes and data classes for condition monitoring |
BS EN 61850-7-2:2010 | Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI) |
I.S. EN 61400-25-4:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
BS EN 61850-10:2013 | Communication networks and systems for power utility automation Conformance testing |
DD IEC/TS 62351-2:2008 | Power systems management and associated information exchange. Data and communications security Glossary of terms |
IEC TR 61850-7-500:2017 | Communication networks and systems for power utility automation - Part 7-500: Basic information and communication structure - Use of logical nodes for modeling application functions and related concepts and guidelines for substations |
IEC TR 61850-90-10:2017 | Communication networks and systems for power utility automation - Part 90-10: Models for scheduling |
I.S. EN 61400-25-5:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING |
IEC TS 62351-7:2010 | Power systems management and associated information exchange - Data and communications security - Part 7: Network and system management (NSM) data object models |
NF EN 61850-7-4 : 2003 | COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-4: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES |
IEC TR 61850-90-17:2017 | Communication networks and systems for power utility automation - Part 90-17: Using IEC 61850 to transmit power quality data |
I.S. EN 61850-8-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
I.S. EN 61850-9-2:2011&A1:2020 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 (IEC 61850-9-2:2011/A1:2020)<br> |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61400-25-4:2016 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
IEC 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
EN 61850-7-3:2011 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 62271-3:2015 | High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
IEC 61850-7-410:2012+AMD1:2015 CSV | Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
EN 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
07/30166751 DC : 0 | BS EN 61850-7-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
16/30347565 DC : 0 | BS EN 61400-25-5 - WIND ENERGY GENERATION SYSTEMS COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
I.S. EN 61850-7-410:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
03/304152 DC : DRAFT MAR 2003 | IEC 61850-10 ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 10: CONFORMANCE TESTING |
05/30137813 DC : DRAFT AUG 2005 | IEC 61400-25-5 ED 1 - WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
PD IEC/TR 61850-90-10:2017 | Communication networks and systems for power utility automation Models for scheduling |
BS EN 61850-7-420:2009 | Communication networks and systems for power utility automation Basic communication structure. Distributed energy resources logical nodes |
IEC 61400-25-4 REDLINE : 2ED 2016 | WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
CEI EN 61850-6 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
NF EN 61400-25-2 : 2016 | WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
IEEE/IEC 1249-2013 | IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation |
I.S. EN 61400-25-1:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
CEI EN 61850-7-3 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-3: BASIC COMMUNICATION STRUCTURE - COMMON DATA CLASSES |
IEEE 2030.100-2017 | IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System |
IEC TR 61850-90-2:2016 | Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres |
IEC 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
I.S. EN 61850-5:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS (IEC 61850-5:2013 (EQV)) |
I.S. EN 61850-10:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
EN 61850-7-410:2013/A1:2016 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL (IEC 61850-7-410:2012/A1:2015) |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC 61400-25-6:2016 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEC 61400-25-1:2017 RLV | Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models |
EN 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
EN 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
ISO 9506-2:2003 | Industrial automation systems Manufacturing Message Specification Part 2: Protocol specification |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
ISO/IEC 8802-3:2000 | Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 3: Carrier sense multiple access with collision detection (CSMA/CD) access method and physical layer specifications |
ISO 9506-1:2003 | Industrial automation systems Manufacturing Message Specification Part 1: Service definition |
IEC TR 61850-90-1:2010 | Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations |
IEC 61346-1:1996 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 1: Basic rules |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 60050-101:1998 | International Electrotechnical Vocabulary (IEV) - Part 101: Mathematics |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC 61850-4:2011 | Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
IEC 61346-2:2000 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 2: Classification of objects and codes for classes |
IEC 61850-3:2013 | Communication networks and systems for power utility automation - Part 3: General requirements |
Please Login or Create an Account so you can add users to your Multi user PDF Later.
Important note : All end users must be registered with an Account prior to user licenses being assigned.
Users cannot be edited or removed once added to your Multi user PDF.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.