• There are no items in your cart

IEEE DRAFT 1248 : D7 97

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

DRAFT GUIDE FOR THE COMMISSIONING OF ELECTRICAL SYSTEMS IN HYDROELECTRIC POWER PLANTS

Superseded date

10-01-1998

Published date

01-12-2013

1 SCOPE AND INTRODUCTION
 1.1 SCOPE
 1.2 INTRODUCTION
2 REFERENCES AND STANDARDS
3 DEFINITIONS
4 STARTUP ORGANIZATION
 4.1 GENERAL
 4.2 OWNER
 4.3 CONTRACTOR
 4.4 ENGINEER
    4.4.1 Project Engineering
    4.4.2 Lead Test Engineer
 4.5 MANUFACTURER/VENDOR
5 COMMISSIONING PROGRAM
 5.1 COMMISSIONING PROGRAM PHASES
    5.1.1 Construction Test Phase
    5.1.2 Pre-operational Test Phase
    5.1.3 Operational Test Phase
6 COMMISSIONING PHASES
 6.1 GENERAL
 6.2 CONSTRUCTION COMPLETION PHASE
    6.2.1 Electrical
    6.2.2 Mechanical
    6.2.3 Piping
    6.2.4 Instrumentation
 6.3 PRE-OPERATIONAL TESTING PHASE
    6.3.1 Electrical
    6.3.2 Mechanical
    6.3.3 Piping
    6.3.4 Instrumentation
 6.4 UNIT STARTUP AND OPERATIONAL PHASE
7 APPLICATION OF GUIDE
 7.1 GENERAL
 7.2 USING THE GUIDE TO DEVELOP A TEST PROGRAM
 7.3 COORDINATING COMMISSIONING TESTS OF SYSTEMS AND UNITS
8 PLANT EQUIPMENT
 8.1 LIST OF EQUIPMENT AND TEST MATRIXES
9 SYSTEMS TESTS
 9.1 LIST OF TESTS AND TEST DESCRIPTIONS
10 DOCUMENTATION
 10.1 RECORD KEEPING
 10.2 ENGINEERING DOCUMENTATION
 10.3 FACTORY DOCUMENTATION
    10.3.1 Factory Testing of Equipment
 10.4 ON-SITE DOCUMENTATION
11 BIBLIOGRAPHY
 11.1 Generators and Motors
 11.2 Transformers
 11.3 Governors
 11.4 Cable and Raceway
 11.5 Protection and Relaying?
 11.6 Excitation
 11.7 Insulation
 11.8 Batteries, Ups, and Standby Power Systems
 11.9 Breakers, Switchgear, Panelboards, and Motor
             Control Centers
 11.10 Control and Scada
 11.11 Grounding
 11.12 Definitions, Codes, References, and Tables
 11.13 Maintenance
 11.14 Fire Protection
 11.15 Miscellaneous
LIST OF FIGURES AND TABLES
Figure 7-1 Example, Equipment Test Matrix
Figure 7-2 Example, Test Description
Figure 7-3 Test Package, Excitation System Control
Figure 7-4 Road Map for a Plant Commissioning Program
Table A1 Equipment / System Tests

Directed to the designers, contractors and plant owners involved in the commissioning of electrical systems of hydroelectric plants.

DocumentType
Draft
PublisherName
Institute of Electrical & Electronics Engineers
Status
Superseded
SupersededBy

IEEE 62-1995 IEEE Guide for Diagnostic Field Testing of Electric Power Apparatus - Part 1: Oil Filled Power Transformers, Regulators, and Reactors
ANSI C50.12 : 2005 SYNCHRONOUS GENERATORS AND GENERATOR/MOTORS FOR HYDRAULIC TURBINE APPLICATIONS, REQUIREMENTS FOR SALIENT POLE SYNCHRONOUS
ANSI C50.10 : 1990 ROTATING ELECTRICAL MACHINERY - SYNCHRONOUS MACHINES
IEEE 4-2013 IEEE Standard for High-Voltage Testing Techniques
IEEE 95-2002 IEEE Recommended Practice for Insulation Testing of AC Electric Machinery (2300 V and Above) With High Direct Voltage
IEEE 115-2009 REDLINE IEEE Guide for Test Procedures for Synchronous Machines Part I—Acceptance and Performance Testing Part II—Test Procedures and Parameter Determination for Dynamic Analysis
IEEE 43-2013 REDLINE IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.