MIL-STD-1521 Revision B:1985
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
04-10-1995
1 Scope
1.1 Purpose
1.2 Classification
1.3 Application
2 Referenced documents
3 Definitions
3.1 System Requirements Review (SRR)
3.2 System Design Review (SDR)
3.3 Software Specification Review (SSR)
3.4 Preliminary Design Review (PDR)
3.5 Critical Design Review (CDR)
3.6 Test Readiness Review (TRR)
3.7 Functional Configuration Audit (FCA)
3.8 Physical Configuration Audit (PCA)
3.9 Formal Qualification Review (FQR)
3.10 Production Readiness Review (PRR)
4 General requirements
4.1 Contractor participation and responsibilities
4.1.1 Subcontractors and suppliers
4.1.2 Location
4.1.3 Contractor requirements
4.2 Contracting agency participation
4.3 Sample forms
5 Detailed requirements
6 Notes
6.1 Intended use
6.2 Data requirements list and cross reference
6.3 Changes from previous issue
Figures
1 Engineering and test flow
2 Sample action item form
3 Sample certification attachment (FCA)
4 Sample certification attachment (PCA)
5 Review checklist for engineering data
6 Engineering data discrepancy sheet
Appendixes
A System Requirements Review (SRR)
B System Design Review (SDR)
C Software Specification Review (SSR)
D Preliminary Design Review (PDR)
E Critical Design Review (CDR)
F Test Readiness Review (TRR)
G Functional Configuration Audit (FCA)
H Physical Configuration Audit (PCA)
I Formal Qualification Review (FQR)
J Application guide for tailoring MIL-STD-1521
K Production Readiness Review (PRR)
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.