• There are no items in your cart

NEN EN 197-2 : 2014

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by
withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

CEMENT - PART 2: CONFORMITY EVALUATION

Withdrawn date

04-01-2020

Published date

01-12-2013

Foreword
1 Scope
2 Normative references
3 Definitions
      3.1 Specific definitions
      3.2 General definitions
4 Factory production control by the manufacturer
      4.1 General requirements
      4.2 Internal quality control
      4.3 Autocontrol testing of samples
5 Tasks for the certification body
      5.1 General
      5.2 Surveillance, assessment and acceptance of
             the factory production control
      5.3 Evaluation of the results of autocontrol
             testing of samples
      5.4 Audit testing of samples taken at the
             factory/depot and initial type testing
      5.5 Initial inspection of the factory and the
             factory production control
      5.6 Evaluation of test results during the initial
             period
6 Actions in the event of non-conformity
      6.1 Actions to be taken by the manufacturer
      6.2 Actions to be taken by the certification body
7 Procedure for third party certification of conformity
8 Certification of conformity and conformity mark
      8.1 Indication of conformity
      8.2 Certificate of conformity
      8.3 Conformity mark
9 Requirements for dispatching centers
      9.1 General requirements
      9.2 Tasks for the intermediary
      9.3 Tasks for the third party
8 Certification of conformity and conformity mark
      8.1 Indication of conformity
      8.2 Certificate of conformity
      8.3 Conformity mark
9 Requirements for dispatching centers
      9.1 General requirements
      9.2 Tasks for the intermediary
      9.3 Tasks for the third party
Table 1 - Actions to be taken by the certification body in
          the event of non-conformity of the results of
          autocontrol and/or audit testing
Table 2 - Confirmation and audit testing of samples of
          certified cement taken at dispatching centers:
          properties and minimum testing frequencies
Annex A (normative) Evaluation of the representativeness and
                    the accuracy of the 28 day strength test
                    results
Annex B (informative) General definitions
      B.4 - Definitions from EN 197-1 and EN 196-7
Bibliography

Defines the scheme for the assessment and verification of constancy of performance (AVCP) of cements to their corresponding product specification standards, including certification of constancy of performance by a product certification body. Also provides technical rules for factory production control by the manufacturer, including autocontrol testing of samples, and for the tasks of the product certification body.

DocumentType
Standard
PublisherName
Netherlands Standards
Status
Withdrawn
SupersededBy

Standards Relationship
ONORM EN 197-2 : 2014 Identical
NBN EN 197-2 : 2014 Identical
NS EN 197-2 : 2014 Identical
I.S. EN 197-2:2014 Identical
SN EN 197-2 : 2014 Identical
UNI EN 197-2 : 2014 Identical
BS EN 197-2:2014 Identical
EN 197-2:2014 Identical
NF EN 197-2 : 2014 Identical
DIN EN 197-2:2014-05 Identical
DIN EN 197-2:2000-11 Identical

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.