• There are no items in your cart

NEN EN 45510-6-4 : 1999

Current

Current

The latest, up-to-date edition.

GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 6-4: TURBINE AUXILIARIES - PUMPS

Published date

01-12-2013

Foreword
1 Scope
2 Normative references
3 Definitions
      3.1 Organizational terms
      3.2 Technical terms
      3.3 General terms
4 Brief overall project description
      4.1 Role and organization of purchaser
      4.2 Site location
      4.3 Equipment task
      4.4 Equipment to be purchased
      4.5 Control and instrumentation
      4.6 Electrical supplies and other services
      4.7 Other interfaces
      4.8 Project programme
      4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
      7.1 Operating environment
      7.2 Manning levels
      7.3 Normal operation
      7.4 Operating hoursnts
      7.5 Start-up and shut-down
      7.6 Abnormal conditions
      7.7 Further operational requirements
8 Life expectancy
      8.1 Design life
      8.2 Components requiring periodic maintenance
9 Performance requirements
      9.1 Duty
      9.2 Performance
      9.3 Equipment margins
      9.4 Availability
      9.5 Levels of component redundancy
      9.6 Further performance requirements
10 Design and fabrication
      10.1 Specific equipment features
      10.2 Design justification
      10.3 Material selection
      10.4 Safety
      10.5 Interchangeability
      10.6 Fabrication methods
11 Maintenance requirements
      11.1 Planned maintenance
      11.2 Personnel safety
      11.3 Requirements for access
      11.4 Lifting requirements
      11.5 Special tools
      11.6 Test equipment
      11.7 Spare parts strategy
      11.8 Special precautions
12 Technical documentation requirements
      12.1 Tender documentation
      12.2 Contract documentation
13 Applicable legislation, regulations, standards and
      further requirements
      13.1 Legislation and regulations
      13.2 Standards
      13.3 Further requirements
14 Evaluation criteria
      14.1 General
      14.2 Technical criteria
15 Quality measures
      15.1 General
      15.2 Approvals procedure
      15.3 Inspection requirements
      15.4 Non-conformity
16 Site factors
      16.1 Access
      16.2 Facilities
      16.3 Site specific requirements
17 Verification of specified performance
      17.1 General
      17.2 Works tests
      17.3 Test during installation and commissioning
      17.4 Technical conditions for trial run
      17.5 Functional and performance tests
Bibliography

Gives advice on writing a technical specification for procurement of pump units used in power stations, but not to apparatus used in the nuclear reactor plant area of nuclear power stations. Applies to Feedwater pumps (including start-up and booster pumps); Condensate and condensate booster pumps;; heater drains pumps; boiler recirculation pumps; condenser cooling water pumps; water recirculation pumps of different systems; auxiliary service water pumps;flue gas desulphurization (DeSOx) plants and ash pumps; Also applies to the gear box,(speed increaser or reducer), variable speed drive (hydraulic coupling, but not motor), the turning gear, monitoring devices, maintenance tools, supports of the pump(s) and drive and ancillary systems, couplings, and all services which allow for complete installation of a pump unit.

DocumentType
Standard
PublisherName
Netherlands Standards
Status
Current

Standards Relationship
EN 45510-6-4 : 1999 Identical
DIN EN 45510-6-4:2000-02 Identical
EN 45510-6-4:1999 Identical
I.S. EN 45510-6-4:2000 Identical
BS EN 45510-6-4:2000 Identical
UNE-EN 45510-6-4:2000 Identical

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.