• There are no items in your cart

ONORM B 1801-1 : 2015

Withdrawn
Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by
withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

PROJECT AND OBJECT MANAGEMENT IN CONSTRUCTION - PART 1: OBJECT CONSTRUCTION
Withdrawn date

02-04-2021

Published date

01-12-2013

Diese ÖNORM ist anzuwenden für die Planung und Gliederung von Qualität, Kosten, Terminen sowie für die Gliederung der Dokumentation bei Baumassnahmen während den Phasen Konzeption, Planung und Errichtung. Qualität umfasst Qualität und Quantität; Kosten umfasst Kosten und Finanzierung; Termine umfasst Termine und Ressourcen. Die in dieser ÖNORM aufgezeigte Baugliederung und Leistungsgliederung sind beide für die Qualitäts-, Kosten- und Terminplanung geeignet. Die Anwendung der Gliederungsart muss bei jeder Baumassnahme vereinbart werden.

DocumentType
Standard
PublisherName
Osterreichisches Normungsinstitut/Austrian Standards
Status
Withdrawn
SupersededBy

ONORM A 2063 : 2015 EXCHANGE OF DATA CONCERNING SERVICE DESCRIPTION, TENDER, OFFER, WORKS CONTRACT AND FINAL SETTLEMENT IN ELECTRONIC FORM

DIN 276-4:2009-08 BUILDING COSTS - PART 4: CIVIL CONSTRUCTIONS

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.