• There are no items in your cart

PD 6639:2001

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

PNO-ISC specification number 005 C7. Interconnect message transfer part (MTP)

Available format(s)

Hardcopy , PDF

Withdrawn date

11-15-2002

Language(s)

English

Published date

02-15-2001

0 PREFACE
  0.1 Title
  0.2 Normative Information
  0.3 Contents
  0.4 History
  0.5 Issue Control
  0.6 References
  0.7 Abbreviations
  0.8 Scope
1 GENERAL
2 THE FORM OF THE REQUIREMENTS
3 MANDATORY REQUIREMENTS WHERE STP WORKING APPLIES
  3.1 Treatment of receiver Level 2 signal units which
        are not understood
  3.2 Treatment of Spare Bits and Additional Fields in
        Level 3 received Messages
  3.3 Point Code Allocation
  3.4 Message Length
  3.5 Digital Bearers Derived from Multiplexes other than
        2048kbit/s
  3.6 Bit Rate of Analogue Signalling Data Links
  3.7 Use of the Length Indicator
  3.8 Flags
  3.9 Repetition of Signal Units
  3.10 Error Correction Procedure
  3.11 Processor Outage
  3.12 Threshold for Error Rate Monitor
  3.13 Time-out Values
  3.14 Signalling Network Management
  3.15 Routing of Messages
  3.16 Load Sharing Among Linksets
  3.17 The Number of Links in a linkset
  3.18 Bit Rates of Links within a Linkset
  3.19 Load Sharing within a Linkset
  3.20 Signalling Route Availability
  3.21 Signalling Network Congestion
  3.22 Signalling Link Unavailability
  3.23 Signalling Point Restart
  3.24 Management Inhibiting
  3.25 Congestion Procedures
  3.26 Link Management Procedures
  3.27 Initial Testing of Signalling Links on Activation
        and Restoration
  3.28 Automatic Allocation of Signalling Data Links
  3.29 Allocation of Service Indicator Codes
  3.30 Signalling Network Management Messages
  3.31 Allocation of Signalling Link Codes
  3.32 Signalling Traffic Throughput
  3.33 Message Transfer Times
  3.34 Monitoring and Measurements
4 MANDATORY REQUIREMENTS WHERE STP WORKING DOES NOT APPLY
  4.14 Signalling Network Management
  4.15 Routing of Messages
  4.30 Signalling Network Management Messages

This document identifies the requirements of the MTP that are standardised for use across a national interconnect between Public Network Operators. Both STP and non STP functionally are specified in this document.

Committee
TCT/001
DevelopmentNote
This standard supersedes BS PD6639(1999) and it will come into effect on 15th Feb,2001.
DocumentType
Standard
Pages
18
PublisherName
British Standards Institution
Status
Withdrawn
Supersedes

PD 6627:2001 PNO-ISC Information document number 007. UK Interconnect user of SCCP and MTP

PD 6627:1999 PNO-ISC information document number 007. UK interconnect use of SCCP
PD 6646:1999 PNO-ISC specification number 001. Use of SS No. 7 point codes for network interconnect in the UK

View more information
US$166.30
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.