SAE AIR 6364 : 2017
Current
Current
The latest, up-to-date edition.
TEST FACILITY SHAKEDOWN AND COMMISSIONING
Available format(s)
Hardcopy , PDF
Language(s)
English
Published date
11-29-2017
Publisher
1. SCOPE
2. REFERENCES
3. PHASE 1 - OFF SITE (FACTORY) EQUIPMENT
COMMISSIONING CHECKS
4. PHASE 2 - ON SITE STATIC EQUIPMENT COMMISSIONING
CHECKS (NO ENGINE RUNNING)
5. PHASE 3 - ON SITE DYNAMIC EQUIPMENT CHECKS (INCLUDES
ENGINE RUNNING)
6. NOTES
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.