1. SCOPE
2. REFERENCES
3. LABORATORY TESTING AND SAMPLE SELECTION
4. FIELD SPRAY TESTING
5. PREPARATION OF DRAFT HOLDOVER TIME GUIDELINES
AND FLUID LISTS
6. ROLE OF THE SAE G-12 AIRCRAFT DEICING FLUIDS COMMITTEE
7. ROLE OF THE SAE G-12 HOLDOVER TIME COMMITTEE
8. PUBLICATION OF HOLDOVER TIME GUIDELINES AND FLUID LISTS
9. TIMELINE
10. NOTES