• There are no items in your cart

SAE J 973 : 2013

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

IGNITION SYSTEM MEASUREMENTS PROCEDURE

Available format(s)

Hardcopy , PDF

Superseded date

11-06-2020

Language(s)

English

Published date

06-19-2013

Give specific equipment, conditions and procedures for production of test results which are definitive and reproducible for use by a technical person or group concerned with ignition system design and/or evaluation with specific equipment, conditions and procedures for individual projects, but which are sufficiently standardized for acceptance by other groups working with battery ignition systems for automotive engines.

DocumentType
Standard
Pages
11
PublisherName
SAE International
Status
Superseded
SupersededBy
Supersedes

SAE J2203 : 2014 SAE 17.6 CUBIC INCH SPARK PLUG RATING ENGINE
SAE J 139 : 2014 IGNITION SYSTEM NOMENCLATURE AND TERMINOLOGY

SAE J 139 : 2014 IGNITION SYSTEM NOMENCLATURE AND TERMINOLOGY
SAE AIR 84 : 1960 IGNITION PEAK VOLTAGE MEASUREMENTS

View more information
US$107.38
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.