UFC 3-260-11FA : 2005
Current
The latest, up-to-date edition.
UNIFIED FACILITIES CRITERIA - MODEL DESIGN-BUILD (D-B) REQUEST FOR PROPOSAL (RFP) FOR AIRFIELD CONTRACTS
09-19-2016
CHAPTER 1 - INTRODUCTION
CHAPTER 2 - AIRFIELD PROJECT DEFINITION (FACILITY CRITERIA)
CHAPTER 3 - TECHNICAL GUIDANCE
CHAPTER 4 - RFP SPECIFICATIONS
CHAPTER 5 - DRAWINGS
CHAPTER 6 - DESIGN-CONSTRUCTION TEAM EXPERIENCE
APPENDIX A - REFERENCES
APPENDIX B - DESIGN-BUILD AIRFIELD PROJECT, OUTLINE FOR GOVERNMENT-FURNISHED CONCEPTUAL DESIGN ANALYSIS
APPENDIX C - DESIGN-BUILD AIRFIELD PROJECT: SUBMITTALS LIST
APPENDIX D - UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS) DESIGN-BUILD RFP REVISIONS
APPENDIX E - AIRFIELD EXPERIENCE: DESIGN FIRM
APPENDIX F - AIRFIELD EXPERIENCE: CONSTRUCTION FIRM AND SUBCONTRACTORS
APPENDIX G - KEY PERSONNEL: DESIGN
APPENDIX H - KEY PERSONNEL: CONSTRUCTION
APPENDIX I - SECTION 01010: STATEMENT OF WORK
APPENDIX J - SECTION 01016: DETAILED TECHNICAL REQUIREMENTS
FOR AIRFIELD DESIGN-BUILD
APPENDIX K - SECTION 01018: DESIGN AFTER AWARD
FOR AIRFIELD DESIGN-BUILD
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.