Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

CECC 21999 001 : 1999

Current

Current

The latest, up-to-date edition.

TECHNOLOGY APPROVAL SCHEDULE - MANUFACTURE OF ELECTRICAL CONNECTORS

Published date

12-01-2013

      Introduction
1 General
      1.1 Scope
      1.2 Related Documents
      1.3 Units, Symbols and Technology
      1.4 Standard and Preferred Values
      1.5 Definitions
2 Definition of the Component Technology
      2.1 Scope
      2.2 Description of Activities and Flow Charts
      2.3 Technology Abstract
3 Component Design
      3.1 Scope
      3.2 Description of Activities and Flow Charts
      3.3 Interrelationships
             3.3.1 Design Manufacture
             3.3.2 Customer/User
             3.3.3 Subcontractors, Vendors and Internal
                      Suppliers
4 Piece-Part Manufacture
      4.1 Scope
      4.2 Description of Activities and Flow Charts
      4.3 Materials, Inspection and Handling
      4.4 Equipment
      4.5 Rework
      4.6 Validation and Control of the Process(es)
      4.7 Subcontracting
5 Assembly
      5.1 Scope
      5.2 Description of Activities and Flow Charts
      5.3 Materials, Inspection and Handling
      5.4 Equipment
      5.5 Rework
      5.6 Validation and Control of the Process(es)
      5.7 Subcontracting
6 Testing
      6.1 Scope
      6.2 Description of Activities and Flow Charts
      6.3 Equipment
      6.4 Test Procedures
      6.5 Interrelationships
             6.5.1 Subcontracting
             6.5.2 Verification of Customer Specification
7 Verification and Test Vehicles
      7.1 Process Boundary Verification
      7.2 Product Verification
8 Process Characterisation
      8.1 Identification of Process Characteristics
      8.2 Description of Activities and Flow Charts
9 Primary Packaging and Shipment
      9.1 Description of Activities and Flow Charts
      9.2 Interrelationships
             9.2.1 Verification of Customer Requirements
             9.2.2 Subcontracting
      9.3 Validity of Release
10 Withdrawal of Technology Approval
Figure 1 - Example Flow Chart - Design/Manufacture/Test
Figure 2 - Example Flow Chart - Design
Figure 3 - Example Flow Chart - Piece-Part Manufacture
Figure 4 - Example Flow Chart - Connector Assembly
Figure 5 - Example Flow Chart - Testing of Connectors
Annex A - Example Abstract of Technology Approval

Defines the definitions, terms, quality systems, test, symbols, assessment and verification methods and other requirements relevant to manufacture, design and supply of Electrical Connectors, to conform with general requirements of CECC system for electronic components of assessed quality.

Committee
SR 46
DocumentType
Standard
PublisherName
Cenelec Electronic Components Committee
Status
Current

Standards Relationship
BS CECC 299001:1999 Identical

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more