Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

CGA G 1-8 : 2017

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

GUIDELINE FOR THE OPERATION AND CLOSURE OF CARBIDE LIME PONDS

Withdrawn date

26-02-2017

Published date

12-01-2013

1 Introduction
2 Scope and purpose
3 Definitions
4 Carbide lime technical issues
5 Regulatory issues for carbide lime
6 Potential environmental issues
7 Lime pond operation and maintenance
8 Lime pond closure procedures
9 References
Appendices
Appendix A - Phase I checklist - facility and lime
impoundment characteristics (Informative)
Appendix B - Phase I checklist - regulatory
             requirements (Informative)

Specifies important environmental and safety information regarding the proper operation and closure of carbide lime ponds.

DocumentType
Standard
PublisherName
Compressed Gas Association
Status
Withdrawn
Supersedes

NFPA 51A : 2012 ACETYLENE CYLINDER CHARGING PLANTS
CGA G 1.5 : 2015 CARBIDE LIME: ITS VALUE AND USES
CGA G 1.10 : 2017 GUIDELINE FOR THE SAFE OPERATION OF ACETYLENE GENERATORS

CGA G 1.5 : 2015 CARBIDE LIME: ITS VALUE AND USES

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more