DIN 1961:2016-09
|
GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) - PART B: GENERAL CONDITIONS OF CONTRACT RELATING TO THE EXECUTION OF CONSTRUCTION WORK
|
DIN 18196:2011-05
|
Earthworks and foundations - Soil classification for civil engineering purposes
|
DIN EN ISO 14688-1:2016-07 (Draft)
|
GEOTECHNICAL INVESTIGATION AND TESTING - IDENTIFICATION AND CLASSIFICATION OF SOIL - PART 1: IDENTIFICATION AND DESCRIPTION (ISO 14688-1:2002 + AMD 1:2013)
|
DIN 18300:2016-09
|
GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) - PART C: GENERAL TECHNICAL SPECIFICATIONS IN CONSTRUCTION CONTRACTS (ATV) - EARTHWORKS
|
DIN 18141-1:2014-05
|
SUBSOIL - ANALYSIS OF ROCK SAMPLES - PART 1: DETERMINATION OF THE UNCONFINED COMPRESSIVE STRENGTH
|
DIN 18299:2016-09
|
GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) - PART C: GENERAL TECHNICAL SPECIFICATIONS IN CONSTRUCTION CONTRACTS (ATV) - GENERAL RULES APPLYING TO ALL TYPES OF CONSTRUCTION WORK
|
DIN 18137-2:2011-04
|
SOIL, INVESTIGATION AND TESTING - DETERMINATION OF SHEAR STRENGTH - PART 2: TRIAXIAL TEST
|
DIN EN ISO 14688-2:2016-07 (Draft)
|
GEOTECHNICAL INVESTIGATION AND TESTING - IDENTIFICATION AND CLASSIFICATION OF SOIL - PART 2: PRINCIPLES FOR A CLASSIFICATION (ISO 14688-2:2004 + AMD 1:2013)
|
DIN 18301:2016-09
|
GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) - PART C: GENERAL TECHNICAL SPECIFICATIONS IN CONSTRUCTION CONTRACTS (ATV) - DRILLING WORKS
|
DIN EN ISO 22475-1:2007-01
|
Geotechnical investigation and testing - Sampling methods and groundwater measurements - Part 1: Technical principles for execution (ISO 22475-1:2006); German version EN ISO 22475-1:2006
|
DIN 18122-1:1997-07
|
SOIL, INVESTIGATION AND TESTING - CONSISTENCY LIMITS - PART 1: DETERMINATION OF LIQUID LIMIT AND PLASTIC LIMIT
|
DIN 18125-2:2011-03
|
SOIL INVESTIGATION AND TESTING - DETERMINATION OF DENSITY OF SOIL - PART 2: FIELD TESTS
|
DIN EN 12889:2000-03
|
Trenchless contruction and testing of drains and sewers; English version of DIN EN 12889
|
DIN 4094-4:2002-01
|
SUBSIOL - FIELD TESTING - PART 4: FIELD VANE TEST
|
DIN EN ISO 17892-2:2015-03
|
Geotechnical investigation and testing - Laboratory testing of soil - Part 2: Determination of bulk density (ISO 17892-2:2014)
|
NFP 94 430-1 : 2000
|
ROCK - DETERMINATION OF THE ROCK ABRASIVENESS - PART 1: SCRATCHING-TEST WITH A POINTED TOOL
|
DIN 18307:2016-09
|
GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) - PART C: GENERAL TECHNICAL SPECIFICATIONS IN CONSTRUCTION CONTRACTS (ATV) - LAYING OF PRESSURE PIPEWORK OUTSIDE BUILDINGS
|
DIN 18303:2016-09
|
GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) - PART C: GENERAL TECHNICAL SPECIFICATIONS IN CONSTRUCTION CONTRACTS (ATV) - TIMBERING TO TRENCHWORK
|
DIN EN 1997-2:2010-10
|
Eurocode 7: Geotechnical design - Part 2: Ground investigation and testing (includes Corrigendum AC:2010)
|
DIN 18312:2016-09
|
GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) - PART C: GENERAL TECHNICAL SPECIFICATIONS IN CONSTRUCTION CONTRACTS (ATV) - UNDERGROUND CONSTRUCTION WORK
|
DIN EN ISO 17892-1:2015-03
|
Geotechnical investigation and testing - Laboratory testing of soil - Part 1: Determination of water content (ISO 17892-1:2014)
|
DIN 18126:1996-11
|
Determination of minimum and maximum dry densities of non-cohesive soil
|
DIN 18123:2011-04
|
SOIL, INVESTIGATION AND TESTING - DETERMINATION OF GRAIN-SIZE DISTRIBUTION
|
DIN 18136:2003-11
|
SOIL - INVESTIGATION AND TESTING - UNCONFINED COMPRESSION TEST
|
DIN 1960:2016-09
|
GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) - PART A: GENERAL PROVISIONS RELATING TO THE AWARD OF CONSTRUCTION CONTRACTS
|
DWA-A 125 : 2008 COR 2014
|
PIPE JACKING AND RELATED TECHNIQUES
|
DIN 18128:2002-12
|
Determination the ignition loss of soil
|
DIN EN ISO 22282-4:2012-09
|
Geotechnical investigation and testing - Geohydraulic testing - Part 4: Pumping tests (ISO 22282-4:2012)
|
NFP 18 579 : 2013
|
GRANULATS - DETERMINATION DES COEFFICIENTS D'ABRASIVITE ET DE BROYABILITE
|
DVGW GW 304 : 2008
|
|
DIN 18306:2016-09
|
GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) - PART C: GENERAL TECHNICAL SPECIFICATIONS IN CONSTRUCTION CONTRACTS (ATV) - UNDERGROUND DRAINAGE
|