Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

I.S. EN 60076-19:2015

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

POWER TRANSFORMERS - PART 19: RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS

Available format(s)

Hardcopy , PDF

Superseded date

02-07-2023

Language(s)

English

Published date

01-01-2015

Preview

For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.

Only cited Standards give presumption of conformance to New Approach Directives/Regulations.

National Foreword
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols
5 Power measurement, systematic deviation and uncertainty
6 Procedures for no-load loss measurement
7 Procedures for load loss measurement
8 Three-phase calculations
9 Reporting
10 Estimate of corrections and uncertainty contributions
Annex A (informative) - Example of load loss uncertainty
        evaluation for a large power transformer
Annex B (Informative) - Example of load loss uncertainty
        evaluation for a distribution transformer
Bibliography

Describes the procedures that should be applied to evaluate the uncertainty affecting the measurements of no-load and load losses during the routine tests on power transformers.

DevelopmentNote
For CENELEC adoptions of IEC publications, please check www.iec.ch to be sure that you have any corrigenda that may apply. (01/2017)
DocumentType
Standard
Pages
102
PublisherName
National Standards Authority of Ireland
Status
Superseded
SupersededBy

Standards Relationship
EN 60076-19:2015 Identical

ISO/IEC 17025:2005 General requirements for the competence of testing and calibration laboratories
IEC 61869-3:2011 Instrument transformers - Part 3: Additional requirements for inductive voltage transformers
IEC 61869-2:2012 Instrument transformers - Part 2: Additional requirements for current transformers
EN 61869-3 : 2011 INSTRUMENT TRANSFORMERS - PART 3: ADDITIONAL REQUIREMENTS FOR INDUCTIVE VOLTAGE TRANSFORMERS (IEC 61869-3:2011)
EN 61869-2 : 2012 INSTRUMENT TRANSFORMERS - PART 2: ADDITIONAL REQUIREMENTS FOR CURRENT TRANSFORMERS
IEC 61869-1:2007 Instrument transformers - Part 1: General requirements
EN 61869-1:2009 Instrument transformers - Part 1: General requirements
IEC 60076-1:2011 Power transformers - Part 1: General
CLC/TR 50462:2008 Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors
EN 60076-1:2011 POWER TRANSFORMERS - PART 1: GENERAL (IEC 60076-1:2011)
IEC 60076-2:2011 Power transformers - Part 2: Temperature rise for liquid-immersed transformers
EN 60076-2:2011 Power transformers - Part 2: Temperature rise for liquid-immersed transformers

View more information
$136.38
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more