I.S. EN 60965:2016
Current
The latest, up-to-date edition.
NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM
Hardcopy , PDF
English
01-01-2016
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
National Foreword
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Design principles
6 Design process
7 Functional design
8 System verification and validation
Annex A (informative) - Assessment of safe transfer
time window
Bibliography
Annex ZA (normative) - Normative references to
international publications with their corresponding
European publications
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.