UFC 3-220-05 : 2004
Current
The latest, up-to-date edition.
UNIFIED FACILITIES CRITERIA - DEWATERING AND GROUNDWATER CONTROL
15-09-2016
CHAPTER 1 - INTRODUCTION
CHAPTER 2 - METHODS FOR DEWATERING, PRESSURE RELIEF, AND SEEPAGE CUTOFF
CHAPTER 3 - GEOLOGIC, SOIL, AND GROUNDWATER INVESTIGATIONS
CHAPTER 4 - DESIGN OF DEWATERING, PRESSURE RELIEF, AND GROUNDWATER CONTROL SYSTEMS
CHAPTER 5 - INSTALLATION OF DEWATERING AND GROUNDWATER CONTROL SYSTEMS
CHAPTER 6 - OPERATION AND PERFORMANCE CONTROL
CHAPTER 7 - CONTRACT SPECIFICATIONS
APPENDIX A - REFERENCES AND BIBLIOGRAPHY
APPENDIX B - NOTATIONS
APPENDIX C - FIELD PUMPING TESTS
APPENDIX D - EXAMPLES OF DESIGN OF DEWATERING AND PRESSURE RELIEF SYSTEMS
APPENDIX E - TRANSFORMATION OF ANISOTROPIC SOIL CONDITIONS TO ISOTROPIC SOIL CONDITIONS
APPENDIX F - WELL AND TOTAL DISCHARGE MEASUREMENTS
APPENDIX G - EXAMPLES OF DETAILED DEWATERING SPECIFICATIONS
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.