UFC 4-024-01 : 2008
Current
The latest, up-to-date edition.
UNIFIED FACILITIES CRITERIA - SECURITY ENGINEERING: PROCEDURES FOR DESIGNING AIRBORNE CHEMICAL, BIOLOGICAL, AND RADIOLOGICAL PROTECTION FOR BUILDINGS
26-09-2016
CHAPTER 1 - INTRODUCTION
CHAPTER 2 - ASSUMPTIONS AND DESIGN CONSTRAINTS
CHAPTER 3 - TECHNICAL REQUIREMENTS AND GUIDANCE
CHAPTER 4 - STARTUP, OPERATION, AND MAINTENANCE OF THE COLPRO SYSTEM
APPENDIX A - REFERENCES
APPENDIX B - GLOSSARY
APPENDIX C - AIRLOCKS AND ENTRY OR EXIT PROCESSING
APPENDIX D - SHELTERING IN PLACE
APPENDIX E - PROTECTIVE ACTION PLAN: OPERATIONAL PROCEDURES TO PROTECT EXISTING BUILDINGS AND THEIR OCCUPANTS FROM AIRBORNE HAZARDS
APPENDIX F - DETERMINING THE BUILDING PROTECTION FACTOR
APPENDIX G - COLPRO FILTRATION SYSTEM EQUIPMENT
APPENDIX H - COLPRO FILTRATION SYSTEM TESTING REQUIREMENTS
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.