UFC 4-151-10 : Change 1
Current
The latest, up-to-date edition.
UNIFIED FACILITIES CRITERIA - GENERAL CRITERIA FOR WATERFRONT CONSTRUCTION
28-09-2016
CHAPTER 1 - INTRODUCTION
CHAPTER 2 - PILING
CHAPTER 3 - DECK AND SUBSTRUCTURE FRAMING AND BRACING
CHAPTER 4 - HARDWARE AND FITTINGS (PERMANENT INSTALLATION)
CHAPTER 5 - SPECIAL CONSIDERATIONS
CHAPTER 6 - EVALUATION OF EXISTING WATERFRONT STRUCTURES
CHAPTER 7 - DETERIORATION OF WATERFRONT STRUCTURES
APPENDIX A - REFERENCES
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.