• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

16/30346107 DC : 0

Current

Current

The latest, up-to-date edition.

BS EN 61400-25-1 ED.2 - WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS

Available format(s)

Hardcopy , PDF

Language(s)

English

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Overall description of the IEC 61400-25 series
6 Wind power plant information model
7 Wind power plant information exchange model
8 Mapping to communication protocols

BS EN 61400-25-1 Ed.2.

Committee
45
DocumentType
Draft
Pages
34
PublisherName
British Standards Institution
Status
Current

IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
ISO/IEC 7498-1:1994 Information technology Open Systems Interconnection Basic Reference Model: The Basic Model
IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes

View more information
£20.00
Excluding VAT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.