We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
  • ANSI/ASQC E1 : 1996

    Current The latest, up-to-date edition.
    Add to Watchlist
    This Standard has been added successfully to your Watchlist.
    Please visit My Watchlist to see all standards that you are watching.
    Please log in or to add this standard to your Watchlist.
    We could not add this standard to your Watchlist.
    Please retry or contact support for assistance.
    You need to be logged in to add this standard to your Watchlist.
    Please log in now or create an account to add.
    You already added this Product in the Watchlist.

    Quality Program Guidelines For Project Phase Of Non-nuclear Power Generation Facilities

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  26-02-1996

    Publisher:  American Society of Quality Control

    Add to Watchlist

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 Introduction 1.1 Scope 1.2 Applicability2 Terms and Definitions3 Quality Policy and Quality Program Management 3.1 Quality Objective 3.2 Quality Program Description 3.3 Quality Planning 3.4 Administration 3.5 Quality Audits 3.6 Control of Non-conformances 3.7 Corrective Action 3.8 Statistical Controls 3.9 Quality Records4 Design Control 4.1 Design Organization 4.2 Method of Documenting Design 4.3 Design Review/Verification 4.4 Item Inspection, Examination, and Testing Definition 4.5 Item Identification 4.6 Design Change Control5 Control of Measuring and Test Equipment (M&TE)6 Control of Procurement of Items and Services Included in the Quality Program 6.1 Supplier Qualification 6.2 Procurement Document Preparation, Review, and Control 6.2.1 Preparation of Procurement Documents 6.2.2 Review of Procurement Documents 6.2.3 Changes to Procurement Documents 6.3 Source Surveillance/Inspection 6.4 Supplier Quality Evidence 6.5 Receiving Inspection 6.6 Supplier Performance Evaluation 6.7 Control of Lower-Tier Procurements7 Control of Construction and Installation 7.1 Control of Construction and Installation Activities 7.2 Document Control 7.3 Configuration Control 7.4 Special Process Controls 7.5 Identification of Inspection Status 7.6 Handling and Storage 7.7 Inspection 7.8 Test Control

    Abstract - (Show below) - (Hide below)

    Provides quality program guidelines for that segment of the electrical power generation industry which is not covered by mandatory nuclear quality standards or other industry quality documents that are directly applicable.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher American Society of Quality Control
    Status Current
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective