ANSI/ASQC E1 : 1996
Current
The latest, up-to-date edition.
Quality Program Guidelines For Project Phase Of Non-nuclear Power Generation Facilities
Hardcopy , PDF
English
26-02-1996
1 Introduction 1.1 Scope 1.2 Applicability2 Terms and Definitions3 Quality Policy and Quality Program Management 3.1 Quality Objective 3.2 Quality Program Description 3.3 Quality Planning 3.4 Administration 3.5 Quality Audits 3.6 Control of Non-conformances 3.7 Corrective Action 3.8 Statistical Controls 3.9 Quality Records4 Design Control 4.1 Design Organization 4.2 Method of Documenting Design 4.3 Design Review/Verification 4.4 Item Inspection, Examination, and Testing Definition 4.5 Item Identification 4.6 Design Change Control5 Control of Measuring and Test Equipment (M&TE)6 Control of Procurement of Items and Services Included in the Quality Program 6.1 Supplier Qualification 6.2 Procurement Document Preparation, Review, and Control 6.2.1 Preparation of Procurement Documents 6.2.2 Review of Procurement Documents 6.2.3 Changes to Procurement Documents 6.3 Source Surveillance/Inspection 6.4 Supplier Quality Evidence 6.5 Receiving Inspection 6.6 Supplier Performance Evaluation 6.7 Control of Lower-Tier Procurements7 Control of Construction and Installation 7.1 Control of Construction and Installation Activities 7.2 Document Control 7.3 Configuration Control 7.4 Special Process Controls 7.5 Identification of Inspection Status 7.6 Handling and Storage 7.7 Inspection 7.8 Test Control
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.