BIS IS 2911-4 : 2013

Current

Current

The latest, up-to-date edition.

DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 4: LOAD TEST ON PILES

Published date

12-01-2013

Describes the load test on all types of piles covered in IS 2911 (Part 1/Sec 1), IS2911 (Part 1/Sec 2), IS 2911 (Part 1/Sec 3), IS 2911 (Part 1/Sec 4), IS 2911 (Part 2) and IS 2911 (Part 3) and provides guidelines for determination of safe load based on the following types of loadings: a) Vertical load test (compression); b) Lateral load test; and c) Pull-out test.

Committee
CED 43
DocumentType
Standard
PublisherName
Bureau of Indian Standards
Status
Current

BIS IS 2911-1-4 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 4: PRECAST CONCRETE PILES IN PREBORED HOLES
BIS IS 2911-1-3 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 3: DRIVEN PRECAST CONCRETE PILES
BIS IS 2911-1-1 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 1: DRIVEN CAST IN-SITU CONCRETE PILES
BIS IS 2911-1-2 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 2: BORED CAST IN-SITU CONCRETE PILES

BIS IS 2911-2 : 1980(R2010) CODE OF PRACTICE FOR DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - PART 2: TIMBER PILES
BIS IS 2911-1-4 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 4: PRECAST CONCRETE PILES IN PREBORED HOLES
BIS IS 1904 : 1986(R2005) CODE OF PRACTICE FOR DESIGN AND CONSTRUCTION OF FOUNDATIONS IN SOILS - GENERAL REQUIREMENTS
BIS IS 2911-3 : 1980 AMD 4 2014 CODE OF PRACTICE FOR DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - PART 3: UNDER-REAMED PILES
BIS IS 2911-1-3 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 3: DRIVEN PRECAST CONCRETE PILES
BIS IS 2911-1-1 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 1: DRIVEN CAST IN-SITU CONCRETE PILES
BIS IS 2911-1-2 : 2010 DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS - CODE OF PRACTICE - PART 1: CONCRETE PILES - SECTION 2: BORED CAST IN-SITU CONCRETE PILES

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.