• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

BS EN 29646-5:1992

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

Information technology. Open Systems Interconnection. Conformance testing methodology and framework Requirements on test laboratories and clients for the conformance assessment process

Available format(s)

Hardcopy , PDF

Superseded date

15-06-1996

Language(s)

English

Published date

15-12-1992

Foreword
Introduction
1. Scope
2. Normative references
3. Definitions
4. Abbreviations
4.1 Abbreviations defined in ISO/IEC 9646-1
4.2 Other abbreviations
5. Overview of the Conformance Assessment Process
5.1 Introduction
5.2 Preparation for testing
5.3 Test operations
5.4 Test report production
6. Preparation for testing
6.1 Introduction
6.2 Requirements for SUT testability
6.2.1 Client role
6.3 Communication between the test laboratory and the
      client
6.3.1 Test Laboratory and Client Checklists
6.3.2 Agreement on test methods and selection of test
      suites
6.3.3 Management of technical issues
6.4 Documentation for conformance assessment
6.4.1 Overview
6.4.2 Protocol Implementation Conformance Statement (PICS)
6.4.3 Protocol Implementation eXtra Information for
      Testing (PIXIT)
6.4.4 System Conformance Statement (SCS)
6.4.5 TMP Implementation Statement
7. Test operations
7.1 Introduction
7.2 Static Conformance Review
7.2.1 Test laboratory role
7.2.2 Client role
7.2.3 Mutual role
7.3 Test selection
7.3.1 Test laboratory role
7.3.2 Client role
7.4 Test parameterization
7.4.1 Test laboratory role
7.4.2 Client role
7.5 Test Coordination Procedure verification
7.5.1 Introduction
7.5.2 Mutual role
7.6 Test Campaign
7.6.1 Introduction
7.6.2 Test laboratory role
7.6.3 Client role
7.6.4 Mutual role
7.7 Negotiated Exits during the Test Campaign
7.7.1 Use of a Negotiated Exit
7.7.2 Test laboratory role
7.7.3 Client role
7.7.4 Mutual role
8. Test report production
8.1 Conformance test reports
8.1.1 Introduction
8.2 System Conformance Test Report (SCTR)
8.2.1 Test laboratory role
8.2.2 Client role
8.2.3 Mutual role
8.3 Protocol Conformance Test Report (PCTR)
8.3.1 Test laboratory role
8.3.2 Client role
8.3.3 Mutual role
9. Compliance
9.1 Test laboratory role
9.2 Client role
Annexes
A. System Conformance Test Report (SCTR)
A.1 Introduction
A.2 SCTR Proforma
B. Protocol Conformance Test Report (PCTR)
B.1 Introduction
B.2 PCTR Proforma
C. Skeleton PIXIT Proforma
C.1 Introduction
C.2 PIXIT Proforma
D. Guidance for a PIXIT
E. Summary of Conformance Testing documents
E.1 Abbreviations in this annex
E.2 Use of Conformance Testing documents by the client
      and test laboratory
Figures
1. Overview of the Conformance Assessment Process
2. Preparation for Testing
3. Typical Test Operations

Committee
ICT/1
DevelopmentNote
Supersedes 91/63245 DC. (03/2007)
DocumentType
Standard
Pages
44
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

Standards Relationship
EN 29646-5:1992/AC:1994 Identical
NF EN 29646-5 : 1992 Identical
I.S. EN 29646-5:1993 Identical
NBN EN 29646-5 : 1993 Identical
DIN EN 29646-5:1992-07 Identical

View more information

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.