• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

ESI 43-9 : ISSUE 1 ERRATUM

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

132kV STEEL TOWER TRANSMISSION LINES SPECIFICATION L.7(C) - 1978 2 X 175SQ.MM ASCR/PHASE- 1 X 175SQ.MM ASCR EARTHWIRE

Superseded date

23-07-2013

Published date

12-01-2013

Specifies the design of lattice steel tower transmission lines of double circuit 132 kV construction with twin 175 sq.mm ACSR per phase and single 175 sq.mm ACSR earthwire using lattice steel towers designated as L7(C). Approved alternative conductor arrangements using the same towers are specified in Appendix E.

DocumentType
Standard
PublisherName
Energy Networks Association (UK)
Status
Superseded
SupersededBy

ESI 43-4 : ISSUE 2 AMD 1 DESIGN OF FOUNDATIONS FOR STEEL TOWERS FOR OVERHEAD TRANSMISSION LINES AT 132kV AND HIGHER VOLTAGES
ESI 43-1 : ISSUE 2 AMD 1 SURVEY AND PREPARATION OF GROUND LINE PROFILES AND PLOTTING OF TOWER POSITIONS FOR STEEL TOWER OVERHEAD TRANSMISSION LINES AT 132kV AND HIGHER VOLTAGES
ESI 43-5 : ISSUE 2 FABRICATION AND GALVANIZING OF TOWER AND FOUNDATION STEELWORK FOR OVERHEAD TRANSMISSION LINES AT 132kV AND HIGHER VOLTAGES
ESI 43-6 : ISSUE 2 CONSTRUCTION OF OVERHEAD TRANSMISSION LINES ON STEEL TOWERS FOR 132kV AND HIGHER VOLTAGES

ESI 43-5 : ISSUE 2 FABRICATION AND GALVANIZING OF TOWER AND FOUNDATION STEELWORK FOR OVERHEAD TRANSMISSION LINES AT 132kV AND HIGHER VOLTAGES
ESI 43-8 : ISSUE 2 OVERHEAD LINE CLEARANCES
ESI 43-6 : ISSUE 2 CONSTRUCTION OF OVERHEAD TRANSMISSION LINES ON STEEL TOWERS FOR 132kV AND HIGHER VOLTAGES
ESI 43-4 : ISSUE 2 AMD 1 DESIGN OF FOUNDATIONS FOR STEEL TOWERS FOR OVERHEAD TRANSMISSION LINES AT 132kV AND HIGHER VOLTAGES
ESI 43-1 : ISSUE 2 AMD 1 SURVEY AND PREPARATION OF GROUND LINE PROFILES AND PLOTTING OF TOWER POSITIONS FOR STEEL TOWER OVERHEAD TRANSMISSION LINES AT 132kV AND HIGHER VOLTAGES
ESI 43-90 : ISSUE 3 ANTI CLIMBING DEVICES AND SAFETY SIGNS FOR HV LINES UP TO AND INCLUDING 400kV
ESI 43-7 : ISSUE 2 AMD 1 132kV STEEL TOWER TRANSMISSION LINES: SPECIFICATION L4(M)-1978

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.