GR 82 ILR : ISSUE 2A
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
SIGNALING TRANSFER POINT (STP) GENERIC REQUIREMENTS ISSUES LIST REPORT
23-07-2013
12-01-2013
Preface
Comments and Issues List Report Mechanism
GR-82-ILR Status and Plans
Formatting Comments
Where and When to Submit Comments
1 Introduction
2 Issues List Summary Report
3 Full Report Issues
4 Issues List Description
5 Detailed Description for Issue #10: Proposed
Changes to Link Outage Event Reporting
5.1 Problems With Current Link Outage Notification
Requirements
5.2 New Proposed Link Outage Notifications
5.3 Proposed New Link Outage Reporting Requirements
(Excerpt)
5.3.1 Link Outage Event Report
5.3.2 Link Available Event Report
5.3.3 Sustained Link Failure/Craft Referral
Event Report
5.3.4 Unavailable-Link Minor State Change
Event Report
6 Detailed Description for Issue #113: Proposed
Requirements for OPC-DPC Routing for SS7 Messages
6.1 Memory Administration
6.2 Routing Algorithm
6.3 Network Management
6.4 Data Operations
6.5 Network Data Collection
6.6 Surveillance
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.