• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

ISO 21725-2:2021

Current

Current

The latest, up-to-date edition.

Simplified design of prestressed concrete bridges Part 2: Box-girder bridges

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English

Published date

01-11-2021

This document provides information to perform the design of the prestressed concrete box girder bridge for road that complies with the limitations established in 6.1. The rules of design as set forth in the document are simplifications of more elaborate requirements. Among several erection methods of box girder bridges, the provisions of this document are mainly applicable to full staging method (FSM).

Designs and details for new road bridges address structural integrity by considering the following:

the use of continuity and redundancy to provide one or more alternate paths;

structural members and bearing seat widths that are resistant to damage or instability; and

external protection systems to minimize the effects of reasonably conceived severe loads.

DocumentType
Standard
Pages
83
PublisherName
International Organization for Standardization
Status
Current

View more information
£199.00
Excluding VAT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.