• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

NEN EN 13146-5 : 2012

Current

Current

The latest, up-to-date edition.

RAILWAY APPLICATIONS - TRACK - TEST METHODS FOR FASTENING SYSTEMS - PART 5: DETERMINATION OF ELECTRICAL RESISTANCE

Published date

12-01-2013

Foreword
1 Scope
2 Normative references
3 Terms and definitions, symbols and abbreviations
  3.1 Terms and definitions
  3.2 Symbols and abbreviations
4 Principle
5 Apparatus
  5.1 Rail
  5.2 Water
  5.3 Spray equipment
  5.4 Electricity supply
  5.5 instruments
6 Test specimens
7 Procedure
8 Calculations
9 Test report
Annex A (informative) Resistance/time plot

Defines a laboratory test procedure for determining the electrical resistance, in wet conditions, between the running rails provided by a fastening system fitted to a steel or concrete sleeper, bearer or element of slab track.

DocumentType
Standard
PublisherName
Netherlands Standards
Status
Current

Standards Relationship
UNI EN 13146-5 : 2012 Identical
SN EN 13146-5:2012 Identical
UNE-EN 13146-5:2017 Identical
DIN EN 13146-5:2012-06 Identical
I.S. EN 13146-5:2012 Identical
BS EN 13146-5:2012 Identical
EN 13146-5:2012/AC:2017 Identical

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.