TR 105 174-2-1 : 1.1.1
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); BROADBAND DEPLOYMENT - ENERGY EFFICIENCY AND KEY PERFORMANCE INDICATORS; PART 2: NETWORK SITES; SUB-PART 1: OPERATOR SITES |
ES 205 200-1 : 1.2.1
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); ENERGY MANAGEMENT; GLOBAL KPIS; OPERATIONAL INFRASTRUCTURES; PART 1: GENERAL REQUIREMENTS |
TR 105 174-5-2 : 1.1.1
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); BROADBAND DEPLOYMENT - ENERGY EFFICIENCY AND BROADBAND DEPLOYMENT; PART 5: CUSTOMER NETWORK INFRASTRUCTURES; SUB-PART 2: OFFICE PREMISES (SINGLE-TENANT) |
EN 50600-2-1 : 2014
|
INFORMATION TECHNOLOGY - DATA CENTRE FACILITIES AND INFRASTRUCTURES - PART 2-1: BUILDING CONSTRUCTION |
EN 50174-1:2009/A2:2014
|
INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 1: INSTALLATION SPECIFICATION AND QUALITY ASSURANCE |
TS 105 174-1 : 1.2.1
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); BROADBAND DEPLOYMENT AND ENERGY MANAGEMENT; PART 1: OVERVIEW, COMMON AND GENERIC ASPECTS |
CLC/TR 50173-99-3:2012
|
INFORMATION TECHNOLOGY - GENERIC CABLING SYSTEMS - PART 99-3: HOME CABLING INFRASTRUCTURES UP TO 50 M IN LENGTH TO SUPPORT SIMULTANEOUS AND NON SIMULTANEOUS PROVISION OF APPLICATIONS |
EN 50700 : 2014
|
INFORMATION TECHNOLOGY - PREMISES DISTRIBUTION ACCESS NETWORK (PDAN) CABLING TO SUPPORT DEPLOYMENT OF OPTICAL BROADBAND NETWORKS |
EN 50174-3:2013/A1:2017
|
INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 3: INSTALLATION PLANNING AND PRACTICES OUTSIDE BUILDINGS |
ES 200 671 : 1.2.1
|
TRANSMISSION AND MULTIPLEXING (TM); PASSIVE OPTICAL COMPONENTS; OPTICAL FIBRE CONNECTORS FOR SINGLE MODE OPTICAL FIBRE COMMUNICATION SYSTEMS; COMMON REQUIREMENTS AND CONFORMANCE TESTING |
EN 50173-1:2011
|
INFORMATION TECHNOLOGY - GENERIC CABLING SYSTEMS - PART 1: GENERAL REQUIREMENTS |
EN 50600-1 : 2012
|
INFORMATION TECHNOLOGY - DATA CENTRE FACILITIES AND INFRASTRUCTURES - PART 1: GENERAL CONCEPTS |
ES 205 200-2-1 : 1.2.1
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); ENERGY MANAGEMENT; GLOBAL KPIS; OPERATIONAL INFRASTRUCTURES; PART 2: SPECIFIC REQUIREMENTS; SUB-PART 1: DATA CENTRES |
EN 50174-2 : 2009 AMD 2 2014
|
INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 2: INSTALLATION PLANNING AND PRACTICES INSIDE BUILDINGS |
TS 101 573 : 1.1.1
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); GENERAL ENGINEERING OF OPTICAL BUILDING CABLING |
TR 105 174-5-1 : 1.1.1
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); BROADBAND DEPLOYMENT - ENERGY EFFICIENCY AND KEY PERFORMANCE INDICATORS; PART 5: CUSTOMER NETWORK INFRASTRUCTURES; SUB-PART 1: HOMES (SINGLE-TENANT) |
TS 102 873 : 1.1.1
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); OPTICAL EXTERNAL NETWORK TESTING INTERFACE |
TR 105 174-4 : 1.1.1
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); BROADBAND DEPLOYMENT - ENERGY EFFICIENCY AND KEY PERFORMANCE INDICATORS; PART 4: ACCESS NETWORKS |
CLC/TR 50173-99-2 : 2010
|
INFORMATION TECHNOLOGY - IMPLEMENTATION OF BCT APPLICATIONS USING CABLING IN ACCORDANCE WITH EN 50173-4 |
EN 50173-4 : 2007 AMD 2 2012
|
INFORMATION TECHNOLOGY - GENERIC CABLING SYSTEMS - PART 4: HOMES |