We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
  • SAE AIR 6364 : 2017

    Current The latest, up-to-date edition.
    Add to Watchlist
    This Standard has been added successfully to your Watchlist.
    Please visit My Watchlist to see all standards that you are watching.
    Please log in or to add this standard to your Watchlist.
    We could not add this standard to your Watchlist.
    Please retry or contact support for assistance.
    You need to be logged in to add this standard to your Watchlist.
    Please log in now or create an account to add.
    You already added this Product in the Watchlist.

    TEST FACILITY SHAKEDOWN AND COMMISSIONING

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  29-11-2017

    Publisher:  SAE International

    Add to Watchlist

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1. SCOPE
    2. REFERENCES
    3. PHASE 1 - OFF SITE (FACTORY) EQUIPMENT
       COMMISSIONING CHECKS
    4. PHASE 2 - ON SITE STATIC EQUIPMENT COMMISSIONING
       CHECKS (NO ENGINE RUNNING)
    5. PHASE 3 - ON SITE DYNAMIC EQUIPMENT CHECKS (INCLUDES
       ENGINE RUNNING)
    6. NOTES

    Abstract - (Show below) - (Hide below)

    The paper discusses in general terms the activities required to be undertaken or demonstrated during the establishment of the facility such as:
    the assessment checks prior to forwarding to the end users site for embodiment into the facility system
    the establishment of the facility such as trial installations of hardware, functionality checking of lifting transportation and access systems, centerline pull checks,
    pressure testing of fuel and air start systems, flushing of wet systems and electrical continuity checking.

    General Product Information - (Show below) - (Hide below)

    Committee EG-1E
    Document Type Standard
    Publisher SAE International
    Status Current

    Standards Referencing This Book - (Show below) - (Hide below)

    SAE AIR 4827 : 2016 PHYSICAL MODELING TECHNIQUES FOR JET ENGINE TEST CELL AERODYNAMICS
    SAE ARP 6068 : 2010 GAS TURBINE ENGINE TEST FACILITY VIBRATION MEASUREMENT
    SAE ARP 5758 : 2011 TREND ANALYSIS FOR MAINTAINING CORRELATION OF GAS TURBINE ENGINE TEST CELLS
    SAE ARP 5435 : 2007 APU GAS TURBINE ENGINE TEST CELL CORRELATION
    SAE ARP 6028 : 2015 CONFIGURATION CONTROL FOR MAINTAINING CORRELATION OF GAS TURBINE ENGINE TEST CELLS
    SAE AIR 5026B : 2014 TEST CELL INSTRUMENTATION
    SAE AIR 5295 : 2013(R2018) DESIGN CONSIDERATIONS FOR ENCLOSED TURBOPROP ENGINE TEST CELLS
    SAE AIR 4869 : 2015 DESIGN CONSIDERATIONS FOR ENCLOSED TURBOFAN/TURBOJET ENGINE TEST CELLS
    SAE AIR 4989A : 2013(R2018) DESIGN CONSIDERATIONS FOR ENCLOSED TURBOSHAFT ENGINE TEST CELLS
    SAE ARP 741 : 2016 TURBOFAN AND TURBOJET GAS TURBINE ENGINE TEST CELL CORRELATION
    SAE ARP 5759 : 2013(R2018) ACOUSTICAL CONSIDERATIONS FOR ENGINE TEST CELLS
    SAE ARP 4755 : 2016 TURBOSHAFT/TURBOPROP GAS TURBINE ENGINE TEST CELL CORRELATION
    SAE AIR 4951 : 2011 TEST CELL THRUST MEASUREMENT
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective