• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

SCTE 229 : 2016

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

OPERATIONAL PRACTICE FOR CABLE FACILITY DESIGN PROCESS

Superseded date

12-07-2022

Published date

15-02-2016

NOTICE
1. Introduction
2. Normative References
3. Informative References
4. Compliance Notation
5. Abbreviations and Definitions
6. Overview of Cable Facility Design Process
7. The Cable Facility Design Process
8. Conclusion

Gives the reader with a comprehensive context in which to consider and decide on the design of a new cable facility and of a modification of an existing facility.

DocumentType
Standard
PublisherName
Society of Cable Telecomm Engineers
Status
Superseded
SupersededBy

SCTE 226 : 2015 CABLE FACILITY CLASSIFICATION DEFINITIONS AND REQUIREMENTS
SCTE 184 : 2015 SCTE ENERGY MANAGEMENT OPERATIONAL PRACTICES FOR CABLE FACILITIES

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.