DEFSTAN 02-38/2(2011) : 2011
Current
The latest, up-to-date edition.
REQUIREMENTS FOR THE PREPARATION, IDENTIFICATION AND MANAGEMENT OF DATUM PACK DRAWINGS AND PHOTOGRAPHS FOR SWIFTSURE, TRAFALGAR & VANGUARD CLASS NUCLEAR SUBMARINES
Hardcopy , PDF
English
14-01-2011
1 Scope
2 Warning
3 Normative References
4 Definitions
5 Abbreviations
6 Completeness of Drawings
7 General Drawing Standards & Requirements
8 Updating Datum Pack Drawings (Drawing Requirements)
9 Specific Drawing Definitions
10 Drawings not to the General Standard & Requirements
of this Defence Standard
11 Microfilming and Aperture Cards
12 SDD - SUBMARINE DEFINITION DATABASE
13 Identification Requirements
14 UKALTS
15 Requirements for The Management Control & Distribution
of Datum Pack Drawings & Microfilms
16 Vanguard Class - TECHNICAL DOCUMENT MANAGEMENT SERVICE
(TDMS)
17 Photographs
18 CWE - Collaborative Working Environment
19 Docking and De-Equip Lay up Period (DDLP) & Long Term
Berthing (LTB)
20 MINIMUM REQUIREMENTS FOR NEW CLASSES OF SUBMARINES
21 SCP (System Component Publication)
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.