BS 1139-6:2014
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Metal scaffolding Prefabricated tower scaffolds outside the scope of BS EN 1004, but utilizing components from such systems. Specification
Hardcopy , PDF
27-01-2022
English
31-12-2014
This part of BS1139 specifies requirements for the structural design of prefabricated tower scaffolds utilizing components from mobile access and working towers specified in BSEN1004 but in configurations that are outside of the scope of that standard. These configurations include: prefabricated tower scaffolds outside the height limits of BSEN1004; towers with more than one working platform; large deck tower scaffolds; linked tower scaffolds; cantilever tower scaffolds; stepped tower scaffolds; tower scaffolds used as a means of access; towers built on base plates instead of castors. This British Standard applies to prefabricated tower scaffolds subject to wind loads up to and including 0.1kN/m2. NOTE Where a prefabricated tower scaffold might be subject to wind in excess of 0.1kN/m2, and it cannot be dismantled or moved to avoid these winds, suitable wind design criteria can be found in BSEN1991‑1‑4. This British Standard does not cover prefabricated tower scaffolds using guys as a method of stabilization.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.