UNI CEN/TS 13476-4 : 2013
|
PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - STRUCTURED-WALL PIPING SYSTEMS OF UNPLASTICIZED POLY(VINYLS CHLORIDE) (PVC-U), POLYPROPYLENE (PP) AND POLYETHYLENE (PE) - PART 4: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
EN 773:1999
|
General requirements for components used in hydraulically pressurized discharge pipes, drains and sewers |
EN 450-2:2005
|
Fly ash for concrete - Part 2: Conformity evaluation |
CEN/TS 1456-2:2003
|
Plastics piping systems for buried and above-ground drainage and sewerage under pressure - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for the assessment of conformity |
I.S. EN 14382:2005
|
SAFETY DEVICES FOR GAS PRESSURE REGULATING STATIONS AND INSTALLATIONS - GAS SAFETY SHUT-OFF DEVICES FOR INLET PRESSURES UP TO 100 BAR |
EN 15167-2:2006
|
Ground granulated blast furnace slag for use in concrete, mortar and grout - Part 2: Conformity evaluation |
UNI EN 969 : 2009
|
DUCTILE IRON PIPES, FITTINGS, ACCESSORIES AND THEIR JOINTS FOR GAS PIPELINES - REQUIREMENTS AND TEST METHODS |
EN 681-1:1996/A3:2005
|
ELASTOMERIC SEALS - MATERIALS REQUIREMENTS FOR PIPE JOINT SEALS USED IN WATER AND DRAINAGE APPLICATIONS - PART 1: VULCANIZED RUBBER |
EN 12094-13:2001/AC:2002
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 13: REQUIREMENTS AND TEST METHODS FOR CHECK VALVES AND NON-RETURN VALVES |
EN 13616:2004/AC:2006
|
OVERFILL PREVENTION DEVICES FOR STATIC TANKS FOR LIQUID PETROLEUM FUELS |
EN 50380:2017
|
Marking and documentation requirements for Photovoltaic Modules |
EN 12094-12:2003
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 12: Requirements and test methods for pneumatic alarm devices |
PD CEN/TS 13598-3:2012 (published 2012-05)
|
Plastics piping systems for non-pressure underground drainage and sewerage. Unplasticized poly(vinyl chloride)(PVC-U), polypropylene (PP) and polyethylene (PE) Guidance for assessment of conformity |
EN 969:2009
|
Ductile iron pipes, fittings, accessories and their joints for gas pipelines - Requirements and test methods |
BS EN 13380:2001
|
General requirements for components used for renovation and repair of drain and sewer systems outside buildings |
EN 50090-8:2000
|
Home and Building Electronic Systems (HBES) - Part 8: Conformity assessment of products |
EN 14525:2004
|
Ductile iron wide tolerance couplings and flange adaptors for use with pipes of different materials: ductile iron, Grey iron, Steel, PVC-U PE, Fibre-cement |
EN 12094-16:2003
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 16: Requirements and test methods for odorizing devices for CO2 low pressure systems |
CEN/TS 1451-2:2012
|
Plastic piping systems for soil and waste discharge (low and high temperature) within the building structure - Polypropylene (PP) - Part 2: Guidance for the assessment of conformity |
CEN/TS 1565-2:2012
|
Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure - Styrene-copolymer blends (SAN+PVC) - Part 2: Guidance for the assessment of conformity |
EN 12101-1:2005/A1:2006
|
SMOKE AND HEAT CONTROL SYSTEMS - PART 1: SPECIFICATION FOR SMOKE BARRIERS |
CEN/TS 1555-7:2013
|
Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 7: Guidance for the assessment of conformity |
EN 545:2010
|
Ductile iron pipes, fittings, accessories and their joints for water pipelines - Requirements and test methods |
UNI EN 15167-2 : 2006
|
GROUND GRANULATED BLAST FURNACE SLAG FOR USE IN CONCRETE, MORTAR AND GROUT - PART 2: CONFORMITY EVALUATION |
CR 14245:2001
|
Guidelines for the application of EN 197-2 "Conformity Evaluation" |
UNI EN 545 : 2010
|
DUCTILE IRON PIPES, FITTINGS, ACCESSORIES AND THEIR JOINTS FOR WATER PIPELINES - REQUIREMENTS AND TEST METHODS |
CEN/TS 14632:2012
|
PLASTICS PIPING SYSTEMS FOR DRAINAGE, SEWERAGE AND WATER SUPPLY, PRESSURE AND NON-PRESSURE - GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) BASED ON UNSATURATED POLYESTER RESIN (UP) - GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
CEN/TR 15840:2009
|
Evaluation of conformity of fly ash for concrete - Guidelines for the application of EN 450-2 |
CEN/TR 15545:2006
|
Guide to the use of EN 545 |
CEN/TS 13476-4:2013
|
Plastics piping systems for non-pressure underground drainage and sewerage - Structured-wall piping systems of unplasticized poly(vinyl chloride) (PVC-U), polypropylene (PP) and polyethylene (PE) - Part 4: Guidance for the assessment of conformity |
DD ENV 206:1992
|
CONCRETE - PERFORMANCE, PRODUCTION, PLACING AND COMPLIANCE CRITERIA |
EN 15655:2009
|
Ductile iron pipes, fittings and accessories - Internal polyurethane lining for pipes and fittings - Requirements and test methods |
EN 1917:2002/AC:2008
|
CONCRETE MANHOLES AND INSPECTION CHAMBERS, UNREINFORCED, STEEL FIBRE AND REINFORCED |
EN 61400-22:2011
|
Wind turbines - Part 22: Conformity testing and certification |
UNI EN 1916 : 2004
|
CONCRETE PIPES AND FITTINGS, UNREINFORCED, STEEL FIBRE AND REINFORCED |
EN 12842:2012
|
Ductile iron fittings for PVC-U or PE piping systems - Requirements and test methods |
EN 12094-2:2003
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 2: Requirements and test methods for non-electrical automatic control and delay devices |
EN 12094-9:2003
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 9: Requirements and test methods for special fire detectors |
EN 14409-1:2004
|
Plastics piping systems for renovation of underground water supply networks - Part 1: General |
CEN ISO/TS 15875-7:2003
|
Plastics piping systems for hot and cold water installations - Crosslinked polyethylene (PE-X) - Part 7: Guidance for the assessment of conformity (ISO/TS 15875-7:2003) |
PD CEN/TS 14632:2012
|
Plastics piping systems for drainage, sewerage and water supply, pressure and non-pressure. Glass-reinforced thermosetting plastics (GRP) based on unsaturated polyester resin (UP). Guidance for the assessment of conformity |
CEN/TS 13598-3:2012
|
Plastics piping systems for non-pressure underground drainage and sewerage - Unplasticized poly(vinyl chloride)(PVC-U), polypropylene (PP) and polyethylene (PE) - Part 3: Guidance for assessment of conformity |
EN 13566-1:2002
|
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks - Part 1: General |
EN 1293:1999
|
General requirements for components used in pneumatically pressurized discharge pipes, drains and sewers |
ENV 1452-7:2000
|
Plastics piping systems for water supply - Unplasticized poly(vinyl chloride) (PVC-U) - Part 7: Guidance for the assessment of conformity |
EN 50090-2-2:1996/A2:2007
|
HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) - PART 2-2: SYSTEM OVERVIEW - GENERAL TECHNICAL REQUIREMENTS |
EN 877:1999/A1:2006/AC:2008
|
CAST IRON PIPES AND FITTINGS, THEIR JOINTS AND ACCESSORIES FOR THE EVACUATION OF WATER FROM BUILDINGS - REQUIREMENTS, TEST METHODS AND QUALITY ASSURANCE |
EN 805:2000
|
Water supply - Requirements for systems and components outside buildings |
EN 12094-10:2003
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 10: Requirements and test methods for pressure gauges and pressure switches |
CEN/TS 12666-2:2012
|
Plastics piping systems for non-pressure underground drainage and sewerage - Polyethylene (PE) - Part 2: Guidance for the assessment of conformity |
EN 12094-1:2003
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 1: Requirements and test methods for electrical automatic control and delay devices |
EN 1916:2002/AC:2008
|
CONCRETE PIPES AND FITTINGS, UNREINFORCED, STEEL FIBRE AND REINFORCED |
EN 1279-6:2002
|
Glass in building - Insulating glass units - Part 6: Factory production control and periodic tests |
CEN ISO/TS 25377:2007
|
Hydrometric uncertainty guidance (HUG) (ISO/TS 25377:2007) |
EN 12094-7:2000/A1:2005
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 7: REQUIREMENTS AND TEST METHODS FOR NOZZLES FOR CO[2] SYSTEMS |
EN 50518-3:2013
|
MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
EN 15267-1:2009
|
Air quality - Certification of automated measuring systems - Part 1: General principles |
PD CEN/TS 1455-2:2012
|
Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure. Acrylonitrile-butadiene-styrene (ABS) Guidance for the assessment of conformity |
BS EN 805:2000
|
Water supply. Requirements for systems and components outside buildings |
DD CEN/TS 13244-7:2003
|
PLASTICS PIPING SYSTEMS FOR BURIED AND ABOVE-GROUND PRESSURE SYSTEMS FOR WATER FOR GENERAL PURPOSES, DRAINAGE AND SEWERAGE - POLYETHYLENE (PE) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
PD CEN/TR 15545:2006
|
GUIDE TO THE USE OF EN 545 |
EN 12094-3:2003
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 3: Requirements and test methods for manual triggering and stop devices |
EN 14408-1:2004
|
Plastics piping systems for renovation of underground gas supply networks - Part 1: General |
CEN/TR 16017:2010
|
Guide to the use of EN 598 |
EN 15189:2006
|
Ductile iron pipes, fittings and accessories - External polyurethane coating for pipes - Requirements and test methods |
EN 12839:2012
|
Precast concrete products - Elements for fences |
DIN EN 12094-8:2016-06 (Draft)
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 8: REQUIREMENTS AND TEST METHODS FOR CONNECTORS |
BS EN 12094-13:2001
|
Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for check valves and non-return valves |
CEN/TS 1401-2:2012
|
Plastics piping systems for non-pressure underground drainage and sewerage - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for assessment of conformity |
BS EN 50380:2017 (published 2017-09)
|
Marking and documentation requirements for Photovoltaic Modules |
DIN EN 14525:2005-02
|
Ductile iron wide tolerance couplings and flange adaptors for use with pipes of different materials: Ductile iron, grey iron, steel, PVC-U, PE, fibre-cement |
EN 334:2005+A1:2009
|
Gas pressure regulators for inlet pressures up to 100 bar |
BS EN 15167-2:2006
|
Ground granulated blast furnace slag for use in concrete, mortar and grout Conformity evaluation |
BS EN 1917:2002
|
Concrete manholes and inspection chambers, unreinforced, steel fibre and reinforced |
DIN EN 12094-11:2003-07
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 11: REQUIREMENTS AND TEST METHODS FOR MECHANICAL WEIGHING DEVICES |
BS EN 877 : 1999
|
CAST IRON PIPES AND FITTINGS, THEIR JOINTS AND ACCESSORIES FOR THE EVACUATION OF WATER FROM BUILDINGS - REQUIREMENTS, TEST METHODS AND QUALITY ASSURANCE |
BS EN 12094-16:2003
|
Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for odorizing devices for CO2 low pressure systems |
BS EN 12101-1 : 2006
|
SMOKE AND HEAT CONTROL SYSTEMS - PART 1: SPECIFICATION FOR SMOKE BARRIERS |
BS EN 1279-6:2002
|
GLASS IN BUILDING - INSULATING GLASS UNITS - PART 6: FACTORY PRODUCTION CONTROL AND PERIODIC TESTS |
PD CEN/TS 1565-2:2012
|
PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - STYRENE-COPOLYMER BLENDS (SAN+PVC) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DIN EN 12094-10:2003-09
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 10: Requirements and test methods for pressure gauges and pressure switches; German version EN 12094-10:2003 |
DIN EN 15655:2016-07 (Draft)
|
DUCTILE IRON PIPES, FITTINGS AND ACCESSORIES - INTERNAL POLYURETHANE LINING FOR PIPES AND FITTINGS - REQUIREMENTS AND TEST METHODS |
BS EN 14525:2004
|
Ductile iron wide tolerance couplings and flange adaptors for use with pipes of different materials: ductile iron, grey iron, steel, PVC-U, PE, fibre-cement |
DD ENV 1453-2:2001
|
PLASTIC PIPING SYSTEMS WITH STRUCTURED-WALL PIPES FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPRATURE) INSIDE BUILDINGS - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DD ENV 1250-2:1995
|
WOOD PRESERVATIVES - METHODS OF MEASURING LOSSES OF ACTIVE INGREDIENTS AND OTHER PRESERVATIVE INGREDIENTS FROM TREATED TIMBER - PART 2: LABORATORY METHOD FOR OBTAINING SAMPLES FOR ANALYSIS TO MEASURE LOSSES BY LEACHING INTO WATER OR SYNTHETIC SEA WATER |
BS EN 598 : 2007
|
DUCTILE IRON PIPES, FITTINGS, ACCESSORIES AND THEIR JOINTS FOR SEWERAGE APPLICATIONS - REQUIREMENTS AND TEST METHODS |
BS EN 1916:2002
|
Concrete pipes and fittings, unreinforced, steel fibre and reinforced |
BS EN 13566-1:2002
|
PLASTICS PIPING SYSTEMS FOR RENOVATION OF UNDERGROUND NON-PRESSURE DRAINAGE AND SEWERAGE NETWORKS - PART 1: GENERAL |
PD CEN/TS 1566-2:2012 (published 2012-08)
|
Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure. Chlorinated poly(vinyl chloride) (PVC-C) Guidance for assessment of conformity |
DD CEN ISO/TS 25377:2007
|
Hydrometric uncertainty guide |
DD ENV 1401-2:2001
|
PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - GUIDANCE FOR ASSESSMENT OF CONFORMITY |
BS EN 12094-11:2003
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 11: REQUIREMENTS AND TEST METHODS FOR MECHANICAL WEIGHING DEVICES |
DD ENV 1452-7:2001
|
PLASTICS PIPING SYSTEMS FOR WATER SUPPLY - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DD ENV 1519-2:2001
|
PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - POLYETHYLENE (PE) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DIN EN 12094-4:2004-10
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 4: Requirements and test methods for container valve assemblies and their actuators; German version EN 12094-4:2004 |
DD ENV 1565-2:2001
|
PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - STYRENE COPOLYMER BLENDS (SAN AND PVC) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
CEN/TS 1566-2:2012
|
Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure - Chlorinated poly(vinyl chloride) (PVC-C) - Part 2: Guidance for assessment of conformity |
CEN/TS 1455-2:2012
|
Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure - Acrylonitrile-butadiene-styrene (ABS) - Part 2: Guidance for the assessment of conformity |
DIN EN 12842:2012-11
|
Ductile iron fittings for PVC-U or PE piping systems - Requirements and test methods |
DIN EN 1917:2003-04
|
CONCRETE MANHOLES AND INSPECTION CHAMBERS, UNREINFORCED, STEEL FIBRE AND REINFORCED |
UNE-EN 50380:2003
|
Datasheet and nameplate information for photovoltaic modules |
DIN EN 15267-1:2009-07
|
AIR QUALITY - CERTIFICATION OF AUTOMATED MEASURING SYSTEMS - PART 1: GENERAL PRINCIPLES |
UNE-EN 12839:2012
|
Precast concrete products - Elements for fences |
DIN EN 14382:2016-05 (Draft)
|
SAFETY DEVICES FOR GAS PRESSURE REGULATING STATIONS AND INSTALLATIONS - GAS SAFETY SHUT-OFF DEVICES FOR INLET PRESSURES UP TO 100 BAR |
DIN EN 12101-1:2006-06
|
Smoke and heat control systems - Part 1: Specification for smoke barriers |
DIN EN 12094-9:2003-07
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 9: REQUIREMENTS AND TEST METHODS FOR SPECIAL FIRE DETECTORS |
DIN EN 598:2009-10
|
Ductile iron pipes, fittings, accessories and their joints for sewerage applications - Requirements and test methods (includes Amendment A1:2009) |
DIN EN 12094-6:2006-07
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 6: Requirements and test methods for non-electrical disable devices |
DIN EN 14408-1:2004-12
|
PLASTICS PIPING SYSTEMS FOR RENOVATION OF UNDERGROUND GAS SUPPLY NETWORKS - PART 1: GENERAL |
BS EN 12842:2012
|
DUCTILE IRON FITTINGS FOR PVC-U OR PE PIPING SYSTEMS - REQUIREMENTS AND TEST METHODS |
PD CEN/TS 13476-4:2013
|
PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - STRUCTURED-WALL PIPING SYSTEMS OF UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U), POLYPROPYLENE (PP) AND POLYETHYLENE (PE) - PART 4: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DIN EN 545:2011-09
|
Ductile iron pipes, fittings, accessories and their joints for water pipelines - Requirements and test methods |
ISO/TS 15875-7:2003
|
Plastics piping systems for hot and cold water installations Crosslinked polyethylene (PE-X) Part 7: Guidance for the assessment of conformity |
DIN EN 877:2010-01
|
Cast iron pipes and fittings, their joints and accessories for the evacuation of water from buildings - Requirements, test methods and quality assurance (includes Amendment A1:2006 and Corrigendum AC:2008) |
ISO/TS 15876-7:2003
|
Plastics piping systems for hot and cold water installations Polybutylene (PB) Part 7: Guidance for the assessment of conformity |
CEN/TS 16214-2:2014
|
Sustainability criteria for the production of biofuels and bioliquids for energy applications - Principles, criteria, indicators and verifiers - Part 2: Conformity assessment including chain of custody and mass balance |
ISO 10381-1:2002
|
Soil quality Sampling Part 1: Guidance on the design of sampling programmes |
DIN EN 969:2009-07
|
DUCTILE IRON PIPES, FITTINGS, ACCESSORIES AND THEIR JOINTS FOR GAS PIPELINES - REQUIREMENTS AND TEST METHODS |
UNE-EN 12842:2013
|
Ductile iron fittings for PVC-U or PE piping systems - Requirements and test methods |
DIN EN 12094-5:2006-07
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 5: Requirements and test methods for high and low pressure selector valves and their actuators |
BS EN 334 : 2005
|
GAS PRESSURE REGULATORS FOR INLET PRESSURES UP TO 100 BAR |
PD CEN/TS 1451-2:2012
|
PLASTIC PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - POLYPROPYLENE (PP) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DIN EN 12094-3:2003-07
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 3: REQUIREMENTS AND TEST METHODS FOR MANUAL TRIGGERING AND STOP DEVICES |
DD ENV 1566-2:2001
|
PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - CHLORINATED POLY (VINYL CHLORIDE) (PVC-C) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN 12839:2012
|
PRECAST CONCRETE PRODUCTS - ELEMENTS FOR FENCES |
DIN EN 681-1:2006-11
|
Elastomeric seals - Material requirements for pipe joint seals used in water and drainage applications - Part 1: Vulcanized rubber |
DIN EN 334:2016-05 (Draft)
|
GAS PRESSURE REGULATORS FOR INLET PRESSURES UP TO 100 BAR |
DD ENV ISO 14907-1:2001
|
ROAD TRANSPORT AND TRAFFIC TELEMATICS (RTTT) - ELECTRONIC FEE COLLECTION (EFC) - TEST PROCEDURES FOR USER AND FIXED EQUIPMENT - PART 1: DESCRIPTION OF TEST PROCEDURES |
BS ISO 10381-1:2002
|
SOIL QUALITY - SAMPLING - GUIDANCE ON THE DESIGN OF SAMPLING PROGRAMMES |
PD CEN/TS 1329-2:2012
|
PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DD ENV 1852-2:2001
|
PLASTIC PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - POLYPROPYLENE (PP) - GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN 13980:2002
|
POTENTIALLY EXPLOSIVE ATMOSPHERES - APPLICATION OF QUALITY SYSTEMS |
PD CEN/TS 1519-2:2012
|
PLASTIC PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - POLYETHYLEN (PE) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DIN EN 12094-8:2006-07
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 8: Requirements and test methods for connectors |
BS EN 15267-1:2009
|
Air quality. Certification of automated measuring systems General principles |
PD CEN/TR 16017:2010
|
Guide to the use of EN 598 |
BS EN 3-6:1996
|
PORTABLE FIRE EXTINGUISHERS - PROVISIONS FOR THE ATTESTATION OF CONFORMITY OF PORTABLE FIRE EXTINGUISHERS IN ACCORDANCE WITH EN 3 PART 1 TO PART 5 |
DD CEN/TS 14758-2:2007
|
PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - POLYPROPYLENE WITH MINERAL MODIFIER(S) (PP-MD) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN 14408-1:2004
|
PLASTICS PIPING SYSTEMS FOR RENOVATION OF UNDERGROUND GAS SUPPLY NETWORKS - PART 1: GENERAL |
BS EN 12094-3:2003
|
Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for manual triggering and stop devices |
BS EN 681-1:1996 (published 2006-03)
|
Elastomeric seals. Material requirements for pipe joint seals used in water and drainage applications Vulcanized rubber |
BS EN 12094-9:2003
|
Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for special fire detectors |
BS EN 545:2010
|
Ductile iron pipes, fittings, accessories and their joints for water pipelines. Requirements and test methods |
DD ENV 1329-2:2001
|
PLASTIC PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
PD CEN/TS 12666-2:2012 (published 2012-09)
|
Plastics piping systems for non-pressure underground drainage and sewerage. Polyethylene (PE) Guidance for the assessment of conformity |
I.S. EN 14525:2005
|
DUCTILE IRON WIDE TOLERANCE COUPLINGS AND FLANGE ADAPTORS FOR USE WITH PIPES OF DIFFERENT MATERIALS: DUCTILE IRON, GREY IRON, STEEL, PVC-U PE, FIBRE-CEMENT |
DD CEN/TS 12201-7:2003
|
PLASTICS PIPING SYSTEMS FOR WATER SUPPLY - POLYETHYLENE (PE) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DIN EN 12839:2012-03
|
PRECAST CONCRETE PRODUCTS - ELEMENTS FOR FENCES |
BS EN 12094-12:2003
|
Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for pneumatic alarm devices |
BS EN 969:2009
|
DUCTILE IRON PIPES, FITTINGS, ACCESSORIES AND THEIR JOINTS FOR GAS PIPELINES - REQUIREMENTS AND TEST METHODS |
ISO/TS 15874-7:2003
|
Plastics piping systems for hot and cold water installations Polypropylene (PP) Part 7: Guidance for the assessment of conformity |
DD CEN/TS 14632:2006
|
PLASTICS PIPING SYSTEMS FOR DRAINAGE, SEWERAGE AND WATER SUPPLY, PRESSURE AND NON-PRESSURE - GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) BASED ON POLYESTER RESIN (UP) - GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN 1898:2001
|
SPECIFICATIONS FOR FLEXIBLE INTERMEDIATE BULK CONTAINERS (FIBCS) FOR NON-DANGEROUS GOODS |
UNE-CEN/TS 1555-7:2015
|
Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 7: Guidance for the assessment of conformity |
DIN EN 681-1:2016-07 (Draft)
|
Elastomeric seals - Material requirements for pipe joint seals used in water and drainage applications - Part 1: Vulcanized rubber; German and English version prEN 681-1:2016 |
DIN EN 12094-2:2003-09
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 2: Requirements and test methods for non-electrical automatic control and delay devices; German version EN 12094-2:2003 |
DD CEN/TS 12666-2:2005
|
PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - POLYETHYLENE (PE) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
PD CEN/TS 1401-2:2012
|
PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR ASSESSMENT OF CONFORMITY |
BS EN 50090-8:2001
|
HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) - PART 8: CONFORMITY ASSESSMENT OF PRODUCTS |
BS EN 15189:2006
|
DUCTILE IRON PIPES, FITTINGS AND ACCESSORIES - EXTERNAL POLYURETHANE COATING FOR PIPES - REQUIREMENTS AND TEST METHODS |
DD CEN ISO/TS 15874-7:2003
|
PLASTICS PIPING SYSTEMS FOR HOT AND COLD WATER INSTALLATIONS - POLYPROPYLENE (PP) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
EN 14382:2005+A1:2009/AC:2009
|
SAFETY DEVICES FOR GAS PRESSURE REGULATING STATIONS AND INSTALLATIONS - GAS SAFETY SHUT-OFF DEVICES FOR INLET PRESSURES UP TO 100 BAR |
UNE-EN 545:2011
|
Ductile iron pipes, fittings, accessories and their joints for water pipelines - Requirements and test methods |
BS 8404:2001
|
Packaging. Child-resistant packaging. Requirements and testing procedures for non-reclosable packages for pharmaceutical products |
DD CEN ISO/TS 15876-7:2003
|
PLASTICS PIPING SYSTEMS FOR HOT AND COLD WATER INSTALLATIONS - POLYBUTYLENE (PB) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN 50518-3:2013 (published 2014-09)
|
Monitoring and alarm receiving centre Procedures and requirements for operation |
BS EN 450-2:2005
|
Fly ash for concrete Conformity evaluation |
BS EN 15655:2009
|
DUCTILE IRON PIPES, FITTINGS AND ACCESSORIES - INTERNAL POLYURETHANE LINING FOR PIPES AND FITTINGS - REQUIREMENTS AND TEST METHODS |
DD ENV 1451-2:2001
|
PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - POLYPROPYLENE (PP) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
CEN/TS 1519-2:2012
|
Plastic piping systems for soil and waste discharge (low and high temperature) within the building structure - Polyethylen (PE) - Part 2: Guidance for the assessment of conformity |
DD CEN/TS 1852-2:2009
|
PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - POLYPROPYLENE (PP) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN 12094-6:2006
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 6: REQUIREMENTS AND TEST METHODS FOR NON-ELECTRICAL DISABLE DEVICES |
PD CEN/TS 16214-2:2014
|
Sustainability criteria for the production of biofuels and bioliquids for energy applications. Principles, criteria, indicators and verifiers Conformity assessment including chain of custody and mass balance |
BS EN 12094-4:2004
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 4: REQUIREMENTS AND TEST METHODS FOR CONTAINER VALVE ASSEMBLIES AND THEIR ACTUATORS |
BS EN 12094-5:2006
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 5: REQUIREMENTS AND TEST METHODS FOR HIGH AND LOW PRESSURE SELECTOR VALVES AND THEIR ACTUATORS |
DD CEN/TS 13476-4:2008
|
PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - STRUCTURED-WALL PIPING SYSTEMS OF UNPLASTICIZED PLOY(VINYL CHLORIDE) (PVC-U), POLYPROPYLENE (PP) AND POLYETHYLENE (PE) - PART 4: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN 12094-10:2003
|
Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for pressure gauges and pressure switches |
BS EN 773:1999
|
GENERAL REQUIREMENTS FOR COMPONENTS USED IN HYDRAULICALLY PRESSURIZED DISCHARGE PIPES, DRAINS AND SEWERS |
PD CEN/TR 15840:2009
|
EVALUATION OF CONFORMITY OF FLY ASH FOR CONCRETE - GUIDELINES FOR THE APPLICATION OF EN 450-2 |
DD ENV 1455-2:2001
|
PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - ACRYLONITRILE-BUTADIENE- STYRENE (ABS) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN 12094-8:2006
|
Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for connectors |
BS EN 12094-7:2001
|
FIXED FIREFIGHTING SYSTEMS - COMPONENTS FOR GAS EXTINGUISHING SYSTEMS - PART 7: REQUIREMENTS AND TEST METHODS FOR NOZZLES FOR CO[2] SYSTEMS |
DD CEN/TS 12200-2:2003
|
PLASTICS RAINWATER PIPING SYSTEMS FOR ABOVE GROUND EXTERNAL USE - UNPLASTICIZED POLY (VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DIN EN 15189:2007-02
|
Ductile iron pipes, fittings and accessories - External polyurethane coating for pipes - Requirements and test methods |
UNE-EN 50518-3:2013
|
Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation |
DIN EN 450-2:2005-05
|
Fly ash for concrete - Part 2: Conformity evaluation |
EN 12094-5:2006
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 5: Requirements and test methods for high and low pressure selector valves and their actuators |
EN 12094-8:2006
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 8: Requirements and test methods for connectors |
BS EN 50090-2-2 : 1997
|
HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) - PART 2-2: SYSTEM OVERVIEW - GENERAL TECHNICAL REQUIREMENTS |
DIN ISO 10381-1:2003-08
|
SOIL QUALITY - SAMPLING - PART 1: GUIDANCE ON THE DESIGN OF SAMPLING PROGRAMMES |
DD CEN/TS 1555-7:2003
|
PLASTICS PIPING SYSTEMS FOR THE SUPPLY OF GASEOUS FUELS - POLYETHYLENE (PE) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
UNE-EN 61400-22:2011
|
Wind turbines -- Part 22: Conformity testing and certification |
DD CEN ISO/TS 15875-7:2003
|
PLASTICS PIPING SYSTEMS FOR HOT AND COLD WATER INSTALLATIONS - CROSSLINKED POLYETHYLENE (PE-X) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
ISO/TS 25377:2007
|
Hydrometric uncertainty guidance (HUG) |
DIN EN 1916:2003-04
|
CONCRETE PIPES AND FITTINGS, UNREINFORCED, STEEL FIBRE AND REINFORCED |
BS EN 1293:1999
|
GENERAL REQUIREMENTS FOR COMPONENTS USED IN PNEUMATICALLY PRESSURIZED DISCHARGE PIPES, DRAINS AND SEWERS |
BS EN 14409-1:2004
|
PLASTICS PIPING SYSTEMS FOR RENOVATION OF UNDERGROUND WATER SUPPLY NETWORKS - PART 1: GENERAL |
DD CEN/TS 1456-2:2003
|
PLASTIC PIPING SYSTEMS FOR BURIED AND ABOVE-GROUND DRAINAGE AND SEWERAGE UNDER PRESSURE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN 13616:2004
|
OVERFILL PREVENTION DEVICES FOR STATIC TANKS FOR LIQUID PETROLEUM FUELS |
PD CEN/TS 1555-7:2013 (published 2013-03)
|
Plastics piping systems for the supply of gaseous fuels. Polyethylene (PE) Guidance for the assessment of conformity |
DIN V 1201:2004-08
|
CONCRETE PIPES AND FITTINGS, UNREINFORCED, STEEL FIBRE AND REINFORCED FOR DRAINS AND SEWERS - TYPE 1 AND TYPE 2 - REQUIREMENTS, TEST METHODS AND EVALUATION OF CONFORMITY |
BS EN 61400-22:2011
|
WIND TURBINES - PART 22: CONFORMITY TESTING AND CERTIFICATION |
BS EN 12094-1:2003
|
Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for electrical automatic control and delay devices |
DD ENV 197-2:1996
|
CEMENT - CONFORMITY EVALUATION |
BS EN 14382 : 2005
|
SAFETY DEVICES FOR GAS PRESSURE REGULATING STATIONS AND INSTALLATIONS - GAS SAFETY SHUT-OFF DEVICES FOR INLET PRESSURES UP TO 100 BAR |
UNI EN 14525 : 2005
|
DUCTILE IRON WIDE TOLERANCE COUPLINGS AND FLANGE ADAPTORS FOR USE WITH PIPES OF DIFFERENT MATERIALS: DUCTILE IRON, GREY IRON, STEEL, PVC-U PE, FIBRE-CEMENT |
EN 598:2007+A1:2009
|
Ductile iron pipes, fittings, accessories and their joints for sewerage applications - Requirements and test methods |
EN 12094-6:2006
|
Fixed firefighting systems - Components for gas extinguishing systems - Part 6: Requirements and test methods for non-electrical disable devices |
BS EN 12094-2:2003
|
Fixed firefighting systems. Components for gas extinguishing systems Requirements and test methods for non-electrical automatic control and delay devices |
ISO 16003:2008
|
Components for fire-extinguishing systems using gas— Requirements and test methods — Container valve assemblies and their actuators; selector valves and their actuators; nozzles; flexible and rigid connectors; and check valves and non-return valves |