SAE ARP 5718 : 2017
Current
The latest, up-to-date edition.
Qualifications Required for SAE Type II/III/IV Aircraft Deicing/Anti-Icing Fluid
Hardcopy , PDF
English
07-12-2017
1. SCOPE
2. REFERENCES
3. LABORATORY TESTING AND SAMPLE SELECTION
4. FIELD SPRAY TESTING
5. PREPARATION OF DRAFT HOLDOVER TIME
GUIDELINES AND FLUID LISTS
6. ROLE OF THE SAE G-12 AIRCRAFT DEICING FLUIDS
COMMITTEE
7. ROLE OF THE SAE G-12 HOLDOVER TIME COMMITTEE
8. PUBLICATION OF HOLDOVER TIME GUIDELINES AND
FLUID LISTS
9. TIMELINE
10. NOTES
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.